References
- Ann, J. S Kwon, I. H, and Kim, S, S, (2003), Distribution planning in a multi-echelon inventory model under rolling horizon environmenr, IE Interfaces, 16(4),441-449
- Axsater, S. (2000), Inventury amtrol, Kluwer Academic Publishers, Boston.
- Baker, K. R. and Scudder, G. D. (1990), Sequencing with earliness and tardiness penalties: A review, Operation Research, 38(1),22-36 https://doi.org/10.1287/opre.38.1.22
- Bessler, A. A. and Veinorr, A. F. (1966), Optimal policy for a dynamic multi-echelon inventory model, Naval Research Logistic Quarterly, 13, 355-389 https://doi.org/10.1002/nav.3800130402
- Chopra, S, and Meindi, P, (2001), Supply chain management: strategy, planning, and operation, Prentice Hall, Upper Saddle Rivet, New jersey
- Clark, A. J. and Scarf, H. (1960), Oprimal policies for a mulri-echelon inventory problem, Management Science, 6(4),475-490 https://doi.org/10.1287/mnsc.6.4.475
- Debodr, M. and Graves, S. C (1985), Continuous review policies for a multi-echelon inventory problem, Management Science. 6, 475-490
- Federgruen, A. and Zipkin, P. H. (1984), Compurational issues in an infinite-horizon multi-echelon inventory model, Operation Research, 32, 818-836 https://doi.org/10.1287/opre.32.4.818
- Federguren, A. (1993), Centralized planning models for multi-echelon inventory systems under uncertainty, in Graves, S, C, Rinnooy Kan, A. H G. and Zipkin, P, H. (Eds.), Logistics of production and inventory, NorthHolland, Amsterdam, 133-174
- Glover, F. (1989), Tabu search-Part I, ORSA Journal on Computing, 1, 190-206 https://doi.org/10.1287/ijoc.1.3.190
- Glover, F. (1990), Tabu search-Part II, ORSA Journal on Computing, 2, 4-32 https://doi.org/10.1287/ijoc.2.1.4
- Glover, F. and Laguna, M. (1997), Tabu search, Kluwer Academic Publishers, Boston
- Kim, S H. and Lee, Y. H. (2000), Current stares and future research direcrions in supply chain management, IE Interfaces, 13(3), 288-295
- Laguna, M., Barnes, J. W. and Glover, F. (1991), Tabu search merhods for single machine scheduling problem, Journal of Intelligent Manufacturing, 2, 63-74 https://doi.org/10.1007/BF01471219
- Mazzini, R. and Armenrano, V. A. (2001), A heuristic for single machine scheduling with early and rardy cosrs, European Journal of Operational Research, 128, 129-146 https://doi.org/10.1016/S0377-2217(99)00345-8
- Muckstadt, J. A, (1973), A model for a multi-item, multi-echelon, multi-identure inventory system, Managemmt Science, 20, 472-481 https://doi.org/10.1287/mnsc.20.4.472
- Schmidr, C P. and Nahmias, S, (1985), Optimal policy for a two-stage assembly system under random demand, Operations Research, 33, 1130-1145 https://doi.org/10.1287/opre.33.5.1130
- Sherbrooke, C C (1968), METRIC: A multi-echelon technique for recoverable item control, Operation Research, 16, 122-141 https://doi.org/10.1287/opre.16.1.122
- Van Houtum, G. J-, lnderfurth, K. and Zijm, W, H. M, (1996), Material coordination in stochastic multi-echelon systems, European Journal of Operational Research, 95(1), 1-23 https://doi.org/10.1016/0377-2217(96)00080-X
- Vollmann, T. E., Berry, W. L., Whybark, D. C and Jacobs, F. R. (2004), Manafacturing planning and control for supply chain management, McGraw Hill