참고문헌
- Barringer, H.P.(1998), Life Cycle Cost and Good Practices, NPRA Maintenance Conference
- Barringer, H.P. and Weber, D.P.(1996), Life Cycle Cost Tutorial, Fifth International Conference on Process Plant Reliability
- Chung, J.D. and Bae, D.S.(2005). 'Life-Cost-Cycle Evaluation Analysis of the Shunting Locomotive', Journal of The Korean Society for Railway, 8(3), 260-266
- Han, S.Y. Ha, C.S. and Hong, S.K.(2005), Dependability Management System's Application to Subway Corporation, Journal of the Korean Society for Railway, 8(3), 286-292
- Hwang, H.S.(1995), A Study on a RAM-Based Model for Integrated Automatic Manufacturing System Design and Performance Evaluation, Journal of the Korean Institute of Industrial Engineers, 21(1), 17-32
- Hwang, H.S. and Hwang, G.W.(2001), Reliability Design Based on System Performance-Cost Trade-off for Manufacturing Facility, International Journal of Reliability and Applications, 2(4), 269-280
- Hwang, H.S. and Park, T.W.(2000), Effects of RAM and LCC in Manufacturing System Performance, Journal of the Korean Institute of Industrial Engineers 2000 Proceeding, 44-47
- IEC(2005), IEC 60300-3-3, Dependability management - Part 3:Application guide-Section 3:Life cycle costing
- Jang, J.S. and Youk, C.H.(2002), Analysis of Life Cycle Cost Based on RAM Analysis, Journal of International Cost Institute
- Kwon, Y.S. and Jo, S.Y.(2003), Cost estimation of defense acquisition programs using parametric cost models, 2003 System Engineering Spring Symposium Proceeding, 54-59
- Lee, S.K.(2003), A Study on the Life Cycle Cost by the Parametric Estimation with WBS, 2003 System Engineering Spring Symposium Proceeding, 40-53
- Lee, T.H, and Park, C.S.(2003), Prediction/Investment Cost Analysis for Korea High-Speed Railway System,, 2003 System Engineering Spring Symposium Proceeding, 60-64
- Moon, H.L. et. al.(2000), Methodology to Decide Optimum Replacement Term for Components of Nuclear Power Plants, The Korean Reliability Society 2000 Proceeding, 257-267