Reclamation and Soil Improvement on Ultra Soft Soil (I) - Reclamation

초연약지반의 매립 및 지반개량 사례 연구 (I) - 매립

  • 나영묵 (현대건설(주) 기술개발원) ;
  • 홍의 (현대건설(주) 대만 230 현장) ;
  • 한정수 (현대건설(주) 광양 컨테이너터미널 3-1단계 공사현장)
  • Received : 2004.11.17
  • Published : 2005.03.01

Abstract

The "Silt Pond" is 180 hectares in size and contained ultra soft slurry-like soil varying between 3 to 20 meters in thickness. Reclamation works in the Silt Pond commenced in the mid of 1990s. A considerable amount of subsurface investigation inclusive of sampling, field vane and density logging tests were carried out prior to the reclamation of the Silt Pond. Since material in the Silt Pond is extremely soft, filling was done by spreading sand with high water content in thin and equal thickness lifts, allowing the stability of the slurry-like foundation. Despite the extreme care taken, failures occurred during the sand spreading phase. A large piece of high strength geotextile measuring $900m{\times}700m$ was placed to strengthen the slurry like soil foundation at locations where the ultra-soft soil was found to be exposed. Following the remedial works, the Silt Pond was again reclaimed by sand spreading up to +4.0m CD. The success of the reclamation was confirmed by marine CPT profiling.

실트폰드는 크기가 55만평의 인공연못 안에 두께가 3~20m의 초연약점토가 침전되어 있었다. 1990년대 중반에 매립이 시작되었다. 매립 전 시료채취 및 다양한 종류의 원위치시험을 수행하였다. 실트폰드에 침전되어 있는 흙은 극도로 연약하기 때문에 모래 포설장비를 이용하여 모래를 전 지역에 균등하게 살포하였다. 대단히 주의 깊은 시공에도 불구하고 모래 포설시 대규모 전단파괴가 발생하였다. 따라서 파괴지역에 보강을 위하여 가로가 900m이고 세로가 700m인 고강도 보강매트를 포설한 후 재차 모래를 포설하여 매립을 완료하였다. 매립의 성공은 수중 콘관입시험으로 확인하였다.

Keywords