DOI QR코드

DOI QR Code

Effective Application of PMIS through Analysis of Barriers At the Development of PMIS

PMIS구축의 저해요인 분석을 통한 PMIS의 효율적인 적용방안

  • 김진호 (동명정보대학교 건축공학과)
  • Published : 2005.12.01

Abstract

The objective of this study is to propose effective application of PMIS through analysis of barriers at the development of PMIS. To achieve these objectives, this study 1)analyzes the prior theory about PMIS, 2)performs a case study to embody the problems and barriers of the PMIS in the domestic construction industry, and 3)proposes improvement plans for supporting PMIS by analyzing the results of case study and interviewing experts. And the expectancies of this study are that it can be used as efficient data for improvement of system to systematize contents of PMIS in the domestic construction industry.

Keywords

References

  1. 김문한 외 공저, 건설경영공학, 기문당, 1999.
  2. 경영정보시스템 원론, 형설출판사, 1998.
  3. 대한건축학회 편, 건축시공, 기문당, 1997.
  4. 건설관리 및 경영, 보성각, 1997.
  5. 도윤찬, 건설생산에서의 상호교류 향상을 위한 파트너링 적용 방법에 관한 연구, 서울대학교 석사학위논문, 1996.2.
  6. 박주현, 국내 건설공사에 있어서 PMIS운영실태 및 활성화 방안에 관한 연구, 영남대학교 학위논문, 2000.12
  7. 한영춘 외 1인, 정보시스템의 효과성 평가를 위한 개념적틀, 정보기술 연구, 1996.
  8. 이진주 외 1인 MIS 효과에 대한 평가모형, 경영과학의응용, 제 2 권, 1985.
  9. 이우방, 정보기술 IT기반을 통한 시공관리 선진화 방안, 한국건설관리학회 논문집, 2001.
  10. The principles of MIS, 형설출판사, 1998.
  11. Sanvido, V.E and Medeiros, D. J.(1990). "Applying computer-inte grated manufacturing concepts to construction." J. Constr. Engrg. and Mgmt ASCE. 116(2), p.365-379 https://doi.org/10.1061/(ASCE)0733-9364(1990)116:2(365)
  12. 平成建築生産事典, 彰國社, 1994.
  13. 古阪他, 同時進行型建築生産プロセスの檢討, 第10回建築生産と管理技術シンポジウム論文集, 1997.7

Cited by

  1. Improvement of Cost-Schedule integration based Progress Management through PMIS vol.14, pp.5, 2013, https://doi.org/10.6106/KJCEM.2013.14.5.144
  2. Adoption of Virtual Technology to the Development of a BIM based PMIS vol.13, pp.4, 2013, https://doi.org/10.5345/JKIBC.2013.13.4.333