Water Engineering Research
- Volume 6 Issue 4
- /
- Pages.179-187
- /
- 2005
- /
- 1229-6503(pISSN)
THE CHEONGGYE-CHEON ESTORATION PROJECT AND HYDROLOGICAL CYCLE ANALYSIS
- Kim, Hyeon-Jun (Water Resour. Res. Dept., KICT) ;
- Yoon, Soo-Kil (Planning & Design Office of Cheoggye-Cheon Restoration, Seoul Metropolitan Government) ;
- Noh, Seong-Jin (Water Resour. Res. Dept., KICT) ;
- Jang, Cheol-Hee (Water Resour. Res. Dept., KICT)
- Published : 2005.10.01
Abstract
This paper introduces the Cheonggye-cheon restoration project. The restoration project aims to revive the 600-year-old city of Seoul by recovering the historical heritage, guaranteeing safety from the deteriorated covering structures, creating the environment-friendly space, and revitalizing the neglected city centers. In order to understand the current hydrological cycle of the Chenggye-cheon watershed, the annual water balance of the region was calculated using the observed data including precipitation, runoff, water supply and sewage, and the changes in the groundwater level. The