참고문헌
- 강철형 등, 2000, Preliminary conceptual design and performance assessment of a deep geological repository for high-level waste in the republic of Korea, KAERI-SANDIA final report
- Chandler, N.A. 2003, Twenty Years of Underground Research at Canada's URL, In proceedings of WM'03, Tucson, Arizona, 2003 March 23-27
- Doe, T.W., 1987, Hydraulic fracturing stress measurements in the shaft probe hole at the Underground Research Laboratory, Manitoba, Golder Associates Inc. report to Battelle Memorial Institute, Office of Waste Technology Development
- Doe, T.W., 1989, Hydraulic fracturing stress measurements in horizontal holes at the 240and 420-m Levels of the Underground Research Laboratory, Golder Associates Inc. report to AECL
- Everitt, R.A., A. Brown, C.C. Davison, M. Gascoyne and C.D. Martin, 1990, Regional and Local Settings of the Underground Research Laboratory, In Proceedings of the International Symposium on Unique Underground Structures, Denver, CO
- Gascoyne, M, 2004, Hydrogeochemistry, groundwater ages and sources of salts in a granitic batholith on the Canadian Shield, Southeastern Manitoba, Applied Geochemistry
- Hagan, T.N., GW. Kuzyk, J.K. Mercer and J.L. Gilby, 1989, The Design, Implementation and Monitoring of Full-Face Blast Rounds to Extend a Shaft at AECL's Underground Research Laboratory, In Proceedings of Shaft Engineering Conference, IMM, London, England
- Kjartanson, B.H., M.N.Gray, R.J.Puchala, and B.M.Hawrylewicz, 1989, Excavating largediameter boreholes and shafts in granite with high pressure water jetting, In proceedings of the IMM Shaft Engineering International Conference, Harrogate, England
- Kuzyk, G.W., P.A. Lang, and G. LeBell, 1986, Blast Design and Quality Control at the Second Level of AECL's Underground Research Laboratory, In Proceedings of International Symposium on Large Rock Caverns, Helsinki, Finland
- Kuzyk, G.W., and W.S. Versluis, 1989, Full-Face Shaft Sinking at AECL's Underground Research Laboratory, In Proceedings of the Society of Mining Engineers Annual Meeting, Las Vegas, Nevada
- Kuzyk, G.W., J.R Morris and A.E. Ball, 1990, Shaft Extension Design at the Underground Research Laboratory, In Proceedings of the 12th CIM District Four Meeting in Thunder Bay, Ontario
- Kuzyk, G.W., D.P. Onagi, S.W. Keith and G.R. Karklin,1994, The Development of Long Blast Rounds at AECL's Underground Research Laboratory, In Proceedings of the 12 Annual Canadian Tunnelling Conference, Vancouver, British Columbia
- Kuzyk, G.W., B. Mohonty and D.P. Onagi, 2003, Innovative Blasting Techniques for Excavation of Long Blast Rounds, European Federation of Explosives Engineers 2nd World Conference on Explosives and Blasting, Prague, Czech Republic
- Martin, C.D., 1989, Characterizing In Situ Stress Domains at the Underground Research Laboratory, In Proceedings of 42nd Canadian Geotechnical Conference, Winnipeg, Manitoba
- Mohanty, B. and D. K. Joyce, 1994, Explosive initiation practice and its effect on energy release in commercial explosives Part II, In Proceedings of the 10th Symp. On Explosives and Blasting Res., Intl, Soc. of Explosives Engineers, pp. 149-161
- Onagi, D.P., S.G. Keith and G.W. Kuzyk, 1992, Non-explosive excavation technique developed for the excavation of AECL's Mine-by Experiment test tunnel at the Underground Research laboratory, Presented at the Annual Tunnelling Association of Canada Meeting, Banff, Alberta
- Simmons, G.R., and N.M. Soonawala, 1982, The Underground Research Laboratory Experimental Program, Atomic Energy of Canada Limited Technical Record TR-153
- Thompson, P.M., and N.A. Chandler, 2001, Hydraulic fracturing in situ stress determinations in Borehole 405-047-OC1, Ontario Power Generation Nuclear Waste Management Division Report No 06819-REP-01200-10066- R00