An Approach for Bridge Construction Cost Allocation Considering Traffic Load and Traffic Capacity

교통량과 교통하중을 고려한 교량건설비용의 할당

  • Lee, Dong-Ju (Department of Industrial Systems Engineering, Kongju National University) ;
  • Hwang, In-Keuk (Department of Industrial Systems Engineering, Kongju National University)
  • 이동주 (공주대학교 산업시스템공학과) ;
  • 황인극 (공주대학교 산업시스템공학과)
  • Received : 2003.08.20
  • Accepted : 2004.02.23
  • Published : 2004.06.30

Abstract

The objective of bridge construction cost allocation is to distribute in a fair and rational manner the bridge construction costs among those vehicles using the bridge. In most bridge construction cost allocation studies, bridge construction costs are mainly distributed according to traffic load(gross vehicle weight), without any consideration of bridge capacity requirements(the number of lanes). In this paper, a bridge cost allocation method for considering both traffic capacity and traffic loads is developed. The proposed method is based on cooperative game theory, particularly two concepts known as the Aumann-Shapley (A-S) value and Shapley value. This method can help to analyze the impact of traffic capacity costs. By applying the proposed method to an example, traffic capacity cost is found to be high so that traffic capacity should be considered to allocate the bridge construction costs to vehicle classes in a more equitable manner.

Keywords

References

  1. 이상원, 이종철, 경영호(1997), 게임이론적 접근법에 의한 공항이착륙 시설의 비용배분, 경제논집, 서울대학교 경제연구소, 36(2), 79-105
  2. Aumann, R.J., Shapley, I.S. (1974), Values of Non-Atomic Games, Princeton University Press, Princeron, NJ
  3. Moulin, H. (1995), On Additive Methods to Share Joint Costs, The Japanese Economic Review, 46, 303-332
  4. Lee, D.J. (2002), Game-Theoretic Procedures for Determining Pavement Thickness and Traffic Lane Costs in Highway Cost Allocation, Ph. D. Dissertation, Department of Industrial Engineering, Texas A&M University
  5. Luskin, D., Garcia-Diaz, A., Walton, CM., Zhang, Z. (2001), Highway Cost Allocation in Texas: Final Report 1810-2, Center for Transportation Research and Texas Transportation Institute, Texas A&M University, College Station, TX
  6. Redekop, J. (2000), Increasing Marginal Cost and the Monotonicity of Aumann Shapley Pricing, Working Paper, University of Waterloo, Canada.
  7. Shapley, L.S. (1953), A Value for n-person Games. In: Kuhn, H.W., Tucker, A.W. (Eds.), Contributions to the Theory of Games, Vol. II, Annual Mathematics Study 28, Princeton University Press, Princeton, NJ, 307-317
  8. Transportation Research Board. (1997), Highway Capacity Manual, Transportation Research Board (National Research Council), Washington, D.C
  9. Young ,H.P. (1985), Methods and Principles of Cost Allocation In: Young H.P. (Eds.), Cost Allocation: Methods, Principles, Applications. Elsevier Science Ltd., North Holland, NY, 3-29