DOI QR코드

DOI QR Code

Probabilistic determination of initial cable forces of cable-stayed bridges under dead loads

  • Cheng, Jin (Department of Bridge Engineering, Tongji University) ;
  • Xiao, Ru-Cheng (Department of Bridge Engineering, Tongji University) ;
  • Jiang, Jian-Jing (Department of Civil Engineering, Tsinghua University)
  • 투고 : 2003.01.27
  • 심사 : 2003.10.15
  • 발행 : 2004.02.25

초록

This paper presents an improved Monte Carlo simulation for the probabilistic determination of initial cable forces of cable-stayed bridges under dead loads using the response surfaces method. A response surface (i.e. a quadratic response surface without cross-terms) is used to approximate structural response. The use of the response surface eliminates the need to perform a deterministic analysis in each simulation loop. In addition, use of the response surface requires fewer simulation loops than conventional Monte Carlo simulation. Thereby, the computation time is saved significantly. The statistics (e.g. mean value, standard deviation) of the structural response are calculated through conventional Monte Carlo simulation method. By using Monte Carlo simulation, it is possible to use the existing deterministic finite element code without modifying it. Probabilistic analysis of a truss demonstrates the proposed method' efficiency and accuracy; probabilistic determination of initial cable forces of a cable-stayed bridge under dead loads verifies the method's applicability.

키워드

참고문헌

  1. Bucher, C.G. and Bourgund, U. (1990), "A fast and efficient response surface approach for structural reliability problems", Structural Safety, 7(1), 57-66. https://doi.org/10.1016/0167-4730(90)90012-E
  2. Chen, D.W., Au, F.T.K., Tham, L.G. and Lee, P.K.K. (2000), "Determination of initial cable forces in prestressed concrete cable-stayed bridges for given design deck profiles using the force equilibrium method", Comput. Struct., 74, 1-9. https://doi.org/10.1016/S0045-7949(98)00315-0
  3. Ernst, J.H. (1965), "Der E-Modul von Seilen unter berucksichtigung des Durchhanges", Der Bauingenieur, 40(2), 52-55 (in German).
  4. Furukawa, K., Sugimoto, H., Egusa, T., Inoue, K. and Yamada, Y. (1987), "Studies on optimization of cable prestressing for cable-stayed bridges", Proc. of Int. Conf. on Cable-stayed Bridges, Bangkok, 723-734.
  5. Haldar, Achintya and Mahadevan Sankaran, (2000), Reliability Assessment Using Stochastic Finite Element Analysis, John Wiley & Sons, New York.
  6. Imai, Kiyohiro and Frangopol, Dan M. (2000), "Response prediction of geometrically nonlinear structures", J. Struct. Eng., ASCE, 126(11), 1348-1355. https://doi.org/10.1061/(ASCE)0733-9445(2000)126:11(1348)
  7. Kasuga, A., Arai, H., Breen, J.E. and Furukawa, K. (1985), "Optimum cable-force adjustments in concrete cablestayed bridges", J. Struct. Eng., ASCE, 121(4), 685-694.
  8. Khuri, A. and Cornell, J.A. (1987), Response Surfaces: Designs and Analyses, Dekker, New York.
  9. Melchers, Robert E. (1999), Structural Reliability Analysis and Prediction, John Wiley & Sons, New York.
  10. Montgomery, D.C. (1991), Design and Analysis of Experiments, John Wiley & Sons, New York.
  11. Neter, J., Wasserman, W. and Kutner, M.H. (1985), Applied Linear Statistical Models, Second Edition, Richard D. Irwin, Inc.
  12. Soares, R.C., Mohamed, A., Venturini, W.S. and Lemaire, M. (2002), "Reliability analysis of non-linear reinforced concrete frames using the response surface method", Reliability Engineering and System Safety, 75, 1-16. https://doi.org/10.1016/S0951-8320(01)00043-6
  13. Wang, P.H., Tseng, T.C. and Yang, C.G. (1993), "Initial shape of cable-stayed bridges", Comput. Struct., 46(6), 1095-1106. https://doi.org/10.1016/0045-7949(93)90095-U
  14. Zheng, Y. and Das, P.K. (2000), "Improved response surface method and its application to stiffened plate reliability analysis", Eng. Struct., 22, 544-551. https://doi.org/10.1016/S0141-0296(98)00136-9

피인용 문헌

  1. Introducción de errores aleatorios en el proceso de instalación de los cables en los puentes atirantados vol.66, pp.277, 2015, https://doi.org/10.1016/j.hya.2015.10.002
  2. Determination of cable forces in cable‐stayed bridges constructed under parametric uncertainty vol.27, pp.3, 2010, https://doi.org/10.1108/02644401011029907
  3. Ultimate behavior of steel cable-stayed bridges - I. Rational ultimate analysis method - vol.16, pp.2, 2016, https://doi.org/10.1007/s13296-016-6027-8
  4. Ultimate behavior of steel cable-stayed bridges - II. Parametric study - vol.16, pp.2, 2016, https://doi.org/10.1007/s13296-016-6028-7
  5. Structural stability of cable-stayed bridges vol.15, pp.3, 2015, https://doi.org/10.1007/s13296-015-9019-1
  6. Non-linear time-dependent post-elastic analysis of suspended cable considering creep effect vol.22, pp.2, 2006, https://doi.org/10.12989/sem.2006.22.2.197
  7. Structural behavior of cable-stayed bridges after cable failure vol.59, pp.6, 2016, https://doi.org/10.12989/sem.2016.59.6.1095
  8. Structural stability of cable-stayed bridges during construction vol.17, pp.2, 2017, https://doi.org/10.1007/s13296-017-6006-8
  9. Optimization of stay cables in cable-stayed bridges using finite element, genetic algorithm, and B-spline combined technique vol.49, 2013, https://doi.org/10.1016/j.engstruct.2012.11.036
  10. Ultimate Behavior of Steel Cable-Stayed Bridges During Construction pp.2093-6311, 2019, https://doi.org/10.1007/s13296-018-0176-x
  11. Reliability analysis of tested steel I-beams with web openings vol.41, pp.5, 2012, https://doi.org/10.12989/sem.2012.41.5.575
  12. Optimization of cables size and prestressing force for a single pylon cable-stayed bridge with Jaya algorithm vol.34, pp.6, 2020, https://doi.org/10.12989/scs.2020.34.6.853