A Developmental Study on the Cost Down of the Architectural Temporary Work

건축 가설공사의 COST DOWN 기법 연구

  • Published : 2003.10.25

Abstract

This study is to find out the betterment way of cost down in the architectural temporary work. To do so, it is more important to check every case above all and find and choice optimum way fitting a scene of a construction field. In addition, in case that the way to apply in proportion to a given condition is complicated, the way to find out cost down way is to adopt the individual peculiarity instead of the generality. Hereupon this study is rather to find out the better way to reduce such as material and manpower cost than to leave matters not to be settled to get the best way in the existing temporary work. So this study is composed with finding the existing problems, fixing the focus about the developmental way to reduce cost in the exterior and interior temporary work, presenting the new construction way and describing the merits and attentions of an improved exterior and interior temporary work.