The present with in this country, rock bolt installation, shotcrete, and concrete lining in construction order has become accepted as a general tunnelling method in NATM. On the other hand Unlined tunnelling method, which was developed by many countries near Scandinavian Peninsula with hard rocks comparatively, has recently been introduced all over the world, and numerous studies about that have been being devoted to domestic tunnels. Unlined tunnelling method has been developed on the basis of the permanently unsupported openings, and general 7 requirements for them were suggested by Nick Barton. There are no case record about these conditions for Q-system in this country. Therefore, input parameters for Q-system under these conditions were applied to general road tunnel cross-section and numerical analyses for each condition were executed with UDEC-BB, Distinct Element Method.

현재 국내에서는 굴착 후 록볼트, 숏크리트와 콘크리트 라이닝을 현장에서 타설하는 NATM이 일반적인 터널공법으로 정착되어있는 상태이다. 이에 반해 최근 암반이 양호한 스칸디나비아 반도 부근의 국가를 중심으로 무라이닝 터널공법이 개발되어, 세계각국으로 확대되고 있으며 비교적 암반이 양호한 국내에서도 이러한 무라이닝 터널공법에 대한 적용성이 활발히 연구중 이다. 무라이닝 터널공법은 영구 무지보 지하공동에 대한 연구를 근간으로 발달되어 왔으며, 영구 무지보 지하 굴착에 관해서는 Barton이 수많은 사례기록들을 토대로 일반적인 조건 7가지를 제시하고 있다. 이 조건들은 Q-system에 관한 조건이지만, 국내에는 적용된 실적이 없는 조건이다. 따라서, 이 조건들에 의해 산출된 Q값에 대한 입력변수를 임의의 일반 도로터널단면에 적용하여, 불연속체 해석기법인 UDEC-BB을 사용하여 각 조건에 대해 수치해석적 검증을 실시하였다.

Keywords