Abstract

This paper investigates the structural behavior of modular falsework system under sequential pattern loads. Based on the studies of 25 construction sites, the pattern load sequence modeling is defined as models R (rectangle), L and U. The study focuses on the system critical loads, regions of largest reaction forces, discrepancy between the pattern load and the uniform load, and the warning-system plan. The analysis results show that the critical loads of modular falsework systems with sequential pattern loads are very close to those with the uniform load used in design. The regions of largest reaction forces are smaller than those calculated by the uniform load. However, the regions of largest reaction forces of three models under sequential pattern loads can be considered as the crucial positions of warning-system based on the measured index of loading. The positions of the sensors for the warning-system for these three different models are not identical.

Keywords

References

  1. Chan, S.L. (1988), "Geometric and material nonlinear analysis of beam-columns and frames using the minimum residual displacement method", Int. J. Numer. Meth. Eng., 26, 2657-2669. https://doi.org/10.1002/nme.1620261206
  2. Chan, S.L. and Zhou, Z.H. (1994), "A pointwise equilibrium polynomial (PEP) element for nonlinear analysis of frame", ASCE J. Struct. Eng., 120(6), June, 1703-1717. https://doi.org/10.1061/(ASCE)0733-9445(1994)120:6(1703)
  3. Council of Labor Affairs. (1997), "Investigations of construction accidents: 1993-1995", (IOSH86-03). Research Rep., Taipei, Taiwan, 898pp. (in Chinese).
  4. Hadipriono, F.C. and Wang, H.K. (1986), "Analysis of causes of formwork failures in concrete structures", ASCE J. Construction Engineering and Management, 112(1), March, 112-121. https://doi.org/10.1061/(ASCE)0733-9364(1986)112:1(112)
  5. Huang, Y.L., Chen, H.J., Rosowsky, D.V. and Kao, Y.G. (2000), "Load-carrying capacities and failure modes of scaffold-shoring systems, Part I: Modeling and experiments", Structural Engineering and Mechanics, 10(1), 53-66. https://doi.org/10.12989/sem.2000.10.1.053
  6. Jirsa, J.O., Sozen, M.A. and Siess, C.P. (1969), "Pattern loadings on reinforced concrete floor slabs", J. Struct. Div., ASCE, 96(ST6), June, 1117-1137.
  7. Jofriet, J.C. and McNeice, G.M. (1971), "Pattern loading on reinforced concrete flat plates", Proc., ACI, 68, December, 968-972.
  8. Peng, J.L., Pan, A.D., Rosowsky, D.V., Chen, W.F., Yen, T., and Chan, S.L. (1996a), "High clearance scaffold systems during construction-I. Structural modelling and modes of failure", Eng. Struct., 18(3), 247-257. https://doi.org/10.1016/0141-0296(95)00144-1
  9. Peng, J.L., Rosowsky, D.V., Pan, A.D., Chen, W.F., Chan, S.L. and Yen, T. (1996b), "High clearance scaffold systems during construction-II. Structural analysis and development of design guidelines", Eng. Struct., 18(3), 258-267. https://doi.org/10.1016/0141-0296(95)00145-X
  10. Peng, J.L., Rosowsky, D.V., Pan, A.D., Chen, W.F., Chan, S.L. and Yen, T. (1996c), "Analysis of concrete placement load effects using influence surfaces", ACI Struct. J., 93(2), March-April, 180-186.
  11. Peng, J.L., Wu, C.L. and Huang, P.S. (2000), "Investigation of horizontal force and pattern load placing of fresh concrete", (in Chinese) Proc. the 5th Nat. Conf. on Structural Engineering, Taichung, Taiwan, 2, 1087-1094.
  12. Peng, J.L., Yen, T., Lin, I., Wu, K.L. and Chen, W.F. (1997), "Performance of scaffold frame shoring under pattern loads and load paths", ASCE J. Construction Engineering and Management, 123(2), 138-145. https://doi.org/10.1061/(ASCE)0733-9364(1997)123:2(138)
  13. Rosowsky, D.V., Huang, Y.L., Chen, W.F. and Yen, T. (1994a), "Modeling concrete placement loads during construction", Structural Engineering Review, 6(2), 71-84.
  14. Rosowsky, D., Huston, D., Fuhr, P. and Chen, W. (1994b), "Measuring formwork loads during construction", Concrete International, ACI, 16(11), 21-25.
  15. Yen, T., Huang, Y.L., Peng, J.L., Chen, H.J., Lin, I. and Liu, T.M. (2000), "Technology of construction safety for falsework of higher clearance and large concrete placing area", (in Chinese) Research Report - IOSH89-S121, Council of Labor Affairs, Taipei, Taiwan, 245pp.

Cited by

  1. Experimental and numerical studies of practical system scaffolds vol.91, 2013, https://doi.org/10.1016/j.jcsr.2013.07.028
  2. Effects of geometrical shape and incremental loads on scaffold systems vol.63, pp.4, 2007, https://doi.org/10.1016/j.jcsr.2006.07.006
  3. Scaffold research — A review vol.98, 2014, https://doi.org/10.1016/j.jcsr.2014.01.016
  4. Experimental Study of Modular Falsework System with Wooden Shores under Various Path Loads vol.11, pp.4, 2008, https://doi.org/10.1260/136943308785836844
  5. Analytical and experimental bearing capacities of system scaffolds vol.10, pp.1, 2009, https://doi.org/10.1631/jzus.A0820010