Abstract

The utility and the nuclear research institutes in korea have conducted research for improving inefficient requirements in technical specifications using the results of probability risk assessments and informations with risk. However, the guidance for reviewing the improved technical specifications has not been developed. The objective of this study is to develop a decision-making framework for investigating and reviewing the technical documents associated with the to changes of technical specification This study has developed a decision-making framework for reviewing the improvements of the RI-TS(Risk-Informed Technical Specifications). This work may contribute to enhancing both the safety and the efficiency of nuclear power plants by changing Technical Specifications proposed by the utility.

Keywords

References

  1. 김인석 외, '위험도 기준 지술지침서 개선기술개발,' 한국원자력안전기술원, 2001. 3
  2. Moosung Jae, George E. Apostolakis, 'The Use of Influence Diagrams for Evaluating Severe Accident Management Strategies,' Nuclear Technology, vol. 99, No.2, pp. 142-157, 1992 https://doi.org/10.13182/NT92-A34685
  3. 이윤종, '의사결정론,' 대광출판사, 1999.2
  4. Y. Armand, et aI, 'The Process of Consulting Experts on the Reliability of the Equipment Challenged in Severe Accidents as Part of a Level 2 Probabilistic Safety Assessment(PSA2),' PSAM 5
  5. 'An Approach for Using Probabilistic Risk Assessment in Risk Informed Decisions on Plant Specific Changes to the Licensing Basis,' Regulatory Guide 1.174, Nuclear Regulatory Commission, 1998. 7
  6. 'An Approach for Plant Specific, Risk Informed Decisionmaking: Technical Specifications,' Regulatory Guide 1.177, Nuclear Regulatory Commission, 1998. 8
  7. 강대일 외, '위험도 정보를 이용한 울진 3,4호기의 허용정지시간 변경,' KAERI/TR-1667/2000, 한국원자력연구소, 2000.12