Performance Analysis of a Triple Pressure HRSG

  • Shin, Jee-Young (School of Mechanical Engineering, Dong-Eui University) ;
  • Son, Young-Seok (School of Mechanical Engineering, Dong-Eui University) ;
  • Kim, Moo-Geun (School of Mechanical and Automotive Engineering, Inje University) ;
  • Kim, Jae-Soo- (Plant Eng. & Const. Division, Hyundai Engineering and Construction Co., Ltd.,) ;
  • Jeon, Yong-Joon (Hyundai Inst. of Construction Technology, Hyundai Engineering and Construction Co., Ltd.,)
  • Published : 2003.11.01

Abstract

Operating characteristics of a triple pressure reheat HRSG are analyzed using a commercial software package (Gate Cycle by GE Enter Software). The calculation routine determines all the design parameters including configuration and area of each heat exchanger. The off-design calculation part has the capability of simulating the effect of any operating parameters such as power load, process requirements, and operating mode, etc., on the transient performance of the plant. The arrangement of high-temperature and intermediate-temperature components of the HRSG is changed, and its effect on the steam turbine performance and HRSG characteristics is examined. It is shown that there could be a significant difference in HRSG sizes even though thermal performance is not in great deviation. From the viewpoint of both economics and steam turbine performance, it should be carefully reviewed whether the optimum design point could exist. Off-design performance could be one of the main factors in arranging components of the HRSG because power plants operate at various off-design conditions such as ambient temperature and gas turbine load, etc. It is shown that different heat exchanger configurations lead to different performances with ambient temperature, even though they have almost the same performances at design points.

Keywords

References

  1. Ahn, K. Y. and Antonovsky, V. I., 2001, 'Experimental Analysis of Radiative Heat Interchange on Furnace Exit Plane of a Steam Boiler,' KSME International Journal, Vol. 15, No. 2, pp. 239-247
  2. Dechamps, P. J., 1997, Private Communications, Cockerill Mechanical Industries, Seraing, Belgium
  3. Eisenkolb, P., Pogoreutz, M. and Halozan, H., 1996, 'Modified Rankine Beats Triple Pressure System,' ASME Paper 96-TA-50
  4. EI-Masri, M. A. and Foster-Pegg, R. W., 1996, 'Design of Gas Turbine Combined Cycle and Cogeneration Systems,' Technical Course Lecture Note of GTPRO
  5. Ganapathy, V., 1985, 'Heat-Recovery Boiler Design for Cogeneration,' Oil & Gas Journal, Vol. 83, pp. 116-125
  6. GE Enter Software, 2001, Gate Cycle for Windows, Ver. 5. 40
  7. Incropera, F. P. and DeWitt, D. P., 1996, Fundamentals of Heat and Mass Transfer, 4th ed., John Wiley & Sons Inc., New York
  8. Kehlhofer, R., 1991, Combined-Cycle Gas & Steam Turbine Power Plants, The Fairmont Press, Inc., Georgia
  9. Lee, B. R., Kim, T. S., Ro, S. T., Shin, H. T. and Jeon, Y. J., 2002, 'Thermal Design Analysis of Triple Pressure Heat Recovery Steam Generator and Steam Turbine Systems,' Transactions of KSME, Part B, Vol. 26, No. 3, pp. 507-514
  10. Manen, A. V., 1994, 'HRSG Design for Optimum Combined Cycle Performance,' ASME Paper 94-GT-278
  11. Pasha, A. and Jolly, S., 1995, 'Combined Cycle Heat Recovery Steam Generators Optimum Capabilities and Selection Criteria,' Heat Recovery Systems & CHP, Vol. 15, No. 2, pp. 147-154 https://doi.org/10.1016/0890-4332(95)90021-7
  12. Spencer, R. C., Cotton, K. C., and Canon, C. N., 1963, 'A Method for Predicting the Performance of Steam Turbine-Generators ... 16,500 kW and Larger,' Journal of Engineering for Power, Vol. 85, pp. 249-301 https://doi.org/10.1115/1.3677341