A Study on Operation Standards for Optimal Operating Reserve in Electricity Market

전력시장에서의 적정 운영예비력 기준에 관한 연구

  • 류성호 (한국전력법래소) ;
  • 이강완 ((주)대화기술사) ;
  • 김광원 (울산대 전기전자정보시스템공학부) ;
  • 황갑주 (울산대 전기전자정보시스템공학부)
  • Published : 2003.05.01

Abstract

The deregulation and structural reform of power markets have started from the early 90s, which has brought about new studies on the new environment. Regardless the market structure, however, power systems need to be operated and planned in a stable and reliable manner. Therefore, decisions on proper amount of operating reserves and their reliable operations are very important. Up to now, the decision processes of operating reserves depend mainly on experiences of operators in Korea. When Korean power market comes under private management, operating reserves would influence power rate as well as power Quality, Therefore, it is time to prepare reasonable operating reserve standards in a systematic way for the new environment. This study suggests the proper operating reserve standards considering rules of the power market in Korea. To verify the adequacy of the proposed standards, stability and frequency characteristics of the Korean power system are analyzed as well.

Keywords

References

  1. '도매경쟁시장 기본설계안 설명회-시장참여자 이해관련 Rule', 한국전력거래소, pp.1-95, 2001. 10
  2. 최종보고서, 'CBP단계 보조서비스 비용지불 및 차기경쟁시장(PBP 및 TWBP)대비 보조서비스 준비에 대한 연구', 한국전기연구원, pp.1-235, 2001. 6
  3. 최종보고서, '적정 운영예비력 확보기준 및 확보량 산정에 관한 연구', 한국전력거래소, pp. 1-136, 2002.10
  4. 류성호, 이강완, '운전예비력에 대한 계통주파수 영향', 대한전기학회전력계통연구회, 2002년도 춘계학술발표회논문집 pp.71-73, 2002. 5
  5. 송길영, '신편 전력계통공학', 동일출판사, pp.490-491, 1998.9
  6. 이강완, '계통주파수특성분석에 관한 연구 보고서', 한국전력공사, pp.49-52, 1987. 12
  7. Sreven Stoft, 'Power System &onomics', IEEE Press, 2002
  8. K. Bhattacharya, et al, 'Operation Of Restructured Power Systems', Kluwer Academic Publishers, 2001
  9. M. Shahidehpour, 'Market Operations in Electric Power Systems', IEEE Press, 2002
  10. 'Market Rules for the Ontario Electricity Market', 600pages, IMO, May, 2001
  11. 'NYISO Ancillary Services Manual', NYISO, pp. 1-146, 1999. 7
  12. 'NGC Incentive Schemes from April 2000 : An Initial Consultation', Office of Electricity Regulation, Aug. 1999
  13. 'Adendum to: NYISO Ancillary Services Manual', NYISO, pp. 1-20, March 2001
  14. 'Ancillary Services Requirements Protocol', California ISO, Oct. 2000
  15. 'ERCOT Methodologies for Determining Ancillary Service Requirements', ERCOT, April 2001
  16. 'Ancillary Services in a Two-Settlement System', NE Pool, May 1999
  17. 'Report for The Federal Energy Regulatory Commission Ancillary services Markets', PJM Interconnection, April, 2000