참고문헌
- 김연성, 박영택, 서영호, 유왕진, 유한주,이동규(2001), [품질경영론] , 박영사,pp.441-447
- 나미자, 남기찬, 김정욱, 박수용(2002),SW프로세스 능력에 관한 현황과 기업성과에 관한 연구, [품질경영학회지],제30권, 제1호, pp.22-46
- 최은만(1996), [소프트웨어 곤학] , 희중당, pp.1-17
- 한국능률협회(2000a), [품질씨스텝 문서심사용: 품질 경영매뉴얼]
- 한국능률협회(2000b), [ISO9000: 2001품질경영시스템 - 요구사항] ,pp.105-131
- 한국능률협회(2001), [ISO9000: 2000 전환 기본 교육 과정]
- KSA ISO인증본부 연구개발팀(2002), 경영시스템 인증의 발전, '품질경영', pp.35-41
- Bamford, R. and Deibler, W.(1997),Software Engineering Models For Quality: Comparing the SEI Capability Matuhty Model (CMM) to ISO 9001, Proceedings of 3rd International Software Engineering Standards Symposium, pp.289-292
- El Emam, K., Drouin, J.N., and Melo,W.(1997), SPICE: The Theory andPractice of Software ProcessImprovement and CapabiIityDetermination, CA: IEEE ComputerSociety Press
- Ghosh, H.(1994), A Comparison ofISO9000 and SEI/CMM for SoftwareEngineehng Organizations, Proceedingsof 1994 1st International Conference onSoftware Testing, RelidbiIity andQuality Assurance, pp.78-83
- Gibbs, W.W.(1994), Software'sChronic Chsis, Scientific American,Sep. 1994, pp.86-95
- ISO(1997), ISO/IEC 15504 Draft Standard for Software Process Assessment (Parts 1-9), ISO/IEC15504 Draft Technical Report(DTR),ISO
- Kuvaja, P., Simila, J., Krzanik, L.,Bicego, A., Soukkonen, S. and Koch,G.(1994), Software Process Assessmentand Improuement: The BOOTSTRAPApproach, Blackwell Business, Oxford,United Kingdom
- McGuire, E.G. and McKeown,K.A.(2001), 5 Critical Steps forAdopting CMM in an ISO Environment,Manasement of Engineering andTechnoIogy, pp.430-431
- Paulk, M. C., Curtis, B., Chrissis,M.B. and Weber, C.V.(1993a), CapabilityMatuhty Model for Software, Versionl.1, TechnicaI Report CMU/SEI-93-TR-24, SEI
- Paulk, M. C., Curtis, B., Chhssis, M.B. and Weber, C.V.(1993b), Key Practices of the Capability Maturity Model for Software, Versionl.1,Technical Report CMU/SEI-93-TR-25.SEI
- Paulk, M.C.(1994), A Compahson of ISO 9001 and the Capability Maturity Model for Software, Technical Report CMU/SEI-94-TR-12,SE
- Paulk, M.C.(1995), How ISO 9001 Compares with the CMM, IEEE Software, Vol.12, No.1, Jan. 1995,pp.74-83
- van der Pijl, G.L, Swinkels, G. J. P.,and Verrijdt, J. G.(1997), ISO 9000versus CMM: Standardization andCertification of IS Development,Information and Management, Vol.32,No.6, pp.267-274 https://doi.org/10.1016/S0378-7206(97)00019-0
- Rozman, I., Horvat, R.V., and Gyorkos,J.(1994), United View on ISO9001 Model and SEI CMM, Proceedings of IEEE International Engineering Management Conference, Dayton North, IEEE Press, pp.56-63
- Tnllium(1994), TrilIium: Modet forTetecom Product Development andSupport Process Cnpability, Release3.0, Bell Canada Acquisitions(BCA),Canada
- Zahran, S.(1998), Software ProcessImprovement: Practical GuideIinesfor Business Success, Addison-Wesley