A Study on the Estimation of Total Amounts of Blasted Rock by Detonator Volume used in the Blasting

뇌관당 파쇄암량을 고려한 발파작업수량 산정 연구

  • Published : 2003.03.01

Abstract

A large scale blasting is necessary for the construction or road, harbor or ground foundation of building and it is common that the blasting work is performed by a specialist subcontracted from the construction company who is originally responsible for the project. Sometimes the latter do not agree with the former in total amount of blasted rock. They try to find out real work amount as precisely as possible. The estimation is sometimes carried out by an entrusted person when it is impossible to come to an agreement with each other. There are several methods in estimating the blasted rock volume; a calculation by prescribed equivalents of explosive before construction, a calculation by specific charge per unit volume of rock, and a calculation by rock volume per detonator. In this study, the last method is reviewed and recommended as most reliable one.

도로, 항만, 터파기 등의 공사에서 대량의 발파 작업이 선행되는 경우가 빈번하다. 발파작업은 시공을 맡은 원청 회사측에서 직접 행하는 수도 있지만 대개는 전문적으로 발파를 시행하는 업체에게 하청을 주게 마련이다. 이럴 경우 종종 발파작업이 완료된 이후 원청회사와 하청회사 사이에 발파작업 수량에 대한 원만한 합의를 보지 못할 경우가 있는 이럴 경우 쌍방 혹은 쌍방이 위임한 제3자가 발파작업 수량을 추정하게 된다. 사후에 발파작업수량을 추정하는 방법으로는 일위대가표를 적용한 추정, 시행된 발파의 비장약량을 적용한 추정, 발파작업일보를 비교하여 뇌관당 발파암량을 적용하는 방법들이 있다. 본 연구에서는 특정한 사례를 통하여 뇌관당 발파암량을 적용하여 발파작업수량을 추정하는 방법을 소개하고 이 방법이 다른 여타의 추정 방법에 비하여 가장 신회성이 높음을 입증하였다.

Keywords

References

  1. 심동수, 1998.2, 발파작업 관련 소음 · 진동검토 보고서
  2. 무진엔지니어링, 1998, 일위대가표 : 절취 제어발파에 의한 지반(암반)절단기술
  3. 정덕훈, 1997, 발파진동 및 소음이 주변 보안건물에 미치는 영향권 검토