References
- Atwater, J. B. and Chakravorty, S. S. (1995), Using the theory of constraints to guide the implementation of quality improvement projects in manufacturing operations, International journal of Production Research, 33(6), 1737-1760
- Balakrishnan, J. and Cheng, C. H. (2000), Theory of constraints and linear programming: are-examination, International journal of Production Research, 38(6),1459-1463
- Blacksrone.J. H. Jr. (2001),Theory of constraints - a status report, International journal of Production Research, 39(6), 1053-1080
- Chakravorty, S. S. (1996), Robert Bowden Inc.: a case study of cellular manufacturing and drum-buffer-rope implementation, Production and Inventory Management journal, 37(3),15-19
- Chakravorty, S.S.and Arwarer.J. B. (1998),Implementing quality improvement programs using the focusing steps of the theory of constraints, International journal of Technology Management, 16(4/5/6), 544-555
- Chakravorty, S. S. and Atwater,J. B. (1994), How theory of constraints can be used to direr preventive maintenance, Industrial Management, 36(6), 10-13
- Choi, K. S.(2001), Password for Company Resurrection - TOC, Haneon,Seoul, Korea
- Cook, D. P.(1994), Simulation comparison of traditional, JIT, and TOC manufacturing systems in a flow shop with bottlenecks, Production and Inventory Management journal, 35(1),73-78
- Daniel, V., Guide, V.D.R.Jr. and Ghiselli, G. A. (1995), Implementation of drum-buffer-rope at a military rework depot engine works, Production and Inventory Management journal, 36(3),79-83
- De Colvenaer, D., Maes, J. andGelders, L. (1992),Application of TOC/OPT rules in a medium sized shop, Production Planning and Control, 3(4),413-421
- Demmy, W.S. and Demmy, B. S. (1994), Drum-buffer-rope scheduling and pictures for the yearbook, Production and Inventory Management journal, 35(3), 45-47
- Fredendall, L. D. and Lea, B. R. (1997), Improving the product mix heuristic in the theory of constraints, International journal of Production Research, 35(6), 1535-1544
- Goldratt, E.M.and Cox,J. (김일운,장만익,최광식 공역) (1992), The Goal, North River Press
- Guide, V. D. R., Jr. (1996), Scheduling using drum-buffer-rope in a remanufacturing environment, International journal of Production Research, 34(4),1081-1091
- Hsu, T. C and Chung, S. H. (1998), The TOC-based algorithm for solving product mix problems, Production Planning and Control, 9(1), 36-46
- Jeong, N. K. (1999), TOC - Constraint Management, Daecheong Media, Seoul, Korea
- Kee,R.and Schmidt, C (2000), A comparative analysis of utilizing activity-based costing and the theory of constraints tor making product-mix decisions, International journal of Production Economics, 630), 1-17
- Lockamy, A. III and Spencer, M.S. (1998), Performance measurement in a theory of constraints environment, International journal of Production Research, 36(8),2045-2060
- Luebbe, R. and Finch, B. (1992),Theory of constraints and linear programming: a comparison, International journal of Production Research, 30(6), 1471-1478
- Moden, Y. (1983), Toyota Production System, Industrial Engineering and Management Press
- Miltenburg, J. (1997), Comparing JIT, MR Pand TOC, and embedding TOC into MRP, International journal of Production Research, 35(4), 1147-1169
- Onwubolu, G. C and Mutingi,M. (2001),Agenetical gorithm approach to the Theory of constraints product mix problems, Production Planning and Control, 12(1),21-27
- Perez, J. L. (1997), TOC for world class global supply chain management, Computers and Industrial Engineering, 33(1-2), 289-293
- Plenert,G. (1993), Optimizing theory of constraints when multiple constrained resource exist, European journal of Operational Research, 700), 126-133
- Posnack, A. J. (1994), Theory of constraints: improper applications yields improper conclusions, Production and Inventory Management journal, 350), 85-86
- Radovilsky, Z. D. (1998), A quantitative approach to estimate the size of the time Buffer in the theory of constraints, International journal of Production Economics, 55(2), 113-119
- Rand, G. K. (2000), Critical chain: the theory of constraints applied to project management, International journal of Project Management, 18(3),173-177
- Russel, G. R. and Fry, T. D. (1997), Order review/release and lot splitting in drum-buffer-rope, International journal of Production Research, 35(3),827-845
- Schragenheim, E. and Ronen, B. (1990), Drum-buffer-rope shop floor control, Production and Inventory Management journal, 31(3), 18-22
- Simons,J. V.,Jr., Simpson, W.P., III, Caelson, B.J.,James, S.W., Lettiere, C.A. and Mediate, B.A., Jr. (1996), Formulation and Solution of the drum-buffer-rope constraint scheduling problem (DBRCSP), International journal of Production Research, 34(9),2405-2420.
- Sivasubramanian, R.,Selladurai, V.and Rajamramasamy, N. (2000),The effect of the drum-buffer-rope (DBR) approach on the performance of a synchronous manufacturing system(SMS), Production Planning and Control, 11(8),820-824
- Spencer, M. S. (2000),Theory of constraints in a service application: the Swine Graphics case, International journal of Production Research, 38(5),1101-1108
- Spencer, M.S. and Cox,J.F. (1995), Master production scheduling development in a theory of constraints environment, Production and Inventory Management journal, 36(1),8-14
- Spencer, M.S. and Cox,J. F. (1995),Optimum production technology (OPT)and the theory of constraints (TOC): analysis and genealogy, International journal of Production Research, 33(6),1495-1504
- Wu, S. Y., Morris, J.S. and Gordon,T. M. (1994), Simulation analysis of the effectiveness of Drum-Buffer-Rope scheduling in furniture