참고문헌
- Ali, A., Jatinder, N. D. G.and Tariq, A.(1999), A review of scheduling research involving set up considerations, The Internatiol journal of Management Science, 27(2).219-239
- Armentano V.A. and Yamashita, D. S.(2000), Tabu search for scheduling on identical parallel machines to minimize mean tardiness, journal of Intelligent Manufacturing, 11(5),453-460
- Crauwels, H. A.J. and Potts, C.N. (1998), Local search heuristics for the single machine total weighted tardiness scheduling problem, INFORMS journal on Computing, 10,341-350
- Franca, P.M.,Gendreau.M..Laporte, G.and Muller. F.M.(1996),A tabu search heuristic for the multi processor scheduling problem with sequence dependent set up times, International journal of Production Economics. 43(2-3), 79-89
- Gendreau, M.. Hertz, A. and Laporte, G. (1992), New insertion and post-optimization procedures for the traveling salesman problem. Operations Research, 40(6). 1086-1094
- Glover, F.(1989), Tabu search-Part I, ORSA journal on Computing, 1, 190-206
- Glover, F.(1990), Tabu search-Part II, ORSA journal on Computing, 2, 4-32
- Guinet, A.(1993), Scheduling sequence-dependent jobs on identical parallel machines to minimize completion rime criteria, International journal of Production &search, 31(7), 1579-1594
- Kim, S.Y. and Bobrowski, P.M.(1994), Impact on sequence-dependent setup times on job shop scheduling performance, International journal of Production &search, 32(7), 1503-1520
- Laguna, M. and Velarde. J. L. G. (1991), A search heuristic for just-in-time scheduling in parallel machines, journal of Intelligent Manufacturing, 2(4), 253-260
- Laguna, M.,Barnes.J. W.and Glover, F. (1991). Tabu search methods for single machine scheduling problem, journal of intelligent Manufacturing, 2(2), 63-74
- Lawler, E L., Lensrra.J. K.., Rinnooy Kan, A.H. G. and Shmoys, D. B.(1993), Sequencing and scheduling: algorithms and complexity, in Handbooks in Operations Research and Management Science: Logistics of Production and Inventory, North Holland, 445-522
- Lee, Y.H.,Bhaskran, K.and Pinedo, M.(1997), A heuristic to minimize the total weighted tardiness with sequence-dependent setups, IIE Transactions, 29(1), 45-52
- Lee, Y. H. and Pinedo, M.(1997), Scheduling jobs on parallel machines with sequence-dependent setup times, European Journal of Operational Research, 100(3),464-474
- Matsuo, H.,Sub, c. J. and Sullivan, R S. (1989), A controlled search simulated annealing method for the general job shop scheduling problem, Annals of Operation Research, 21(85-108)
- Parker, R G.,Deane, R H. and Holmes. R.A. (1977), On the use of a vehicle routing algorithm for the parallel processor problems with sequence dependent changeover costs, AIIE Transactions, 9(2), 155-160
- Ovacik, I. M. and Uzsoy, R (1995), Rolling horizon procedures for dynamic parallel machine scheduling with sequence-dependent setup times, International Journal of Production Research, 33(11), 3173-3192
- Uzsoy,R.,http://palette.ecn.purdue.edu/~uzsoy2/Problems/parallellparameters.html
- Vakharia, A. J. and Chang, Y.(1990), A simulated annealing approach to scheduling a manufacturing cell, 40, 559-577