참고문헌
- Berkley, B. J., 'A Review of the Kanban Production Control Research Literature,' Production and Operations Management 1, 4 (1992), 393-411 https://doi.org/10.1111/j.1937-5956.1992.tb00004.x
- Bertrand, J. W. M., 'Multiproduct Optimal Batch Sizes with In-Process Inventories and Multi Work Centers,' IIE Transactions 17, 2 (1985), 157-163 https://doi.org/10.1080/07408178508975286
- Bitran, G. R. and D. Tirupati, 'Lot Sizing Under (Q,R) Policy in a Capacity Constrained Manufacturing Facility,' Robotics & Computer-Integrated Manufacturing 1, 3/4 (1984), 327-337 https://doi.org/10.1016/0736-5845(84)90022-X
- Blackburn, J., Time Based Competition, Richard D. Irwin, Homewood, Illinois, 1991
- Chen, H., M. J. Harrison, A. Mandelbaum, A. VanAckere, and L. M. Wein, 'Empirical Evaluation of a Queueing Network Model for Semiconductor Wafer Fabrication,' Operations Research 36, 2 (1988), 202-215 https://doi.org/10.1287/opre.36.2.202
- Duenyas, I. and W. J. Hopp, 'Quoting Customer Lead Times,' Management Science 41, 1 (1995), 43-57 https://doi.org/10.1287/mnsc.41.1.43
- Henderson, B. D., 'The Logic of Kanban,' The Journal of Business Strategy, 6, 3 (1986), 6-12 https://doi.org/10.1108/eb039115
- Johnson, L. A., and D. C. Montgomery, Operations Research in Production Planning, Scheduling, and Inventory Control, John Wiley & Sons, New York,1974
- Karmarkar, U. S., 'Lotsizes, Lead Times and In-Process Inventories,' Management Science 33, 3 (1987), 409-418 https://doi.org/10.1287/mnsc.33.3.409
- Karmarkar, U. S. and S. Kekre, 'The Dynamic Lot-Sizing Problem with Startup and Reservation Costs,' Operations Research 35, 3 (1987), 389-398 https://doi.org/10.1287/opre.35.3.389
- Kim, I and C. Tang, 'Lead Time and Response Time in a Pull Production Control System,' European Journal of Operational Research 101 (1997), 474-485 https://doi.org/10.1016/S0377-2217(96)00174-9
- Lenstra, J. K., A. Rinnooy Kan, and P. Brucker, 'Complexity of Machine Scheduling problems,' Annals of Discrete Mathematics 1 (1977), 343-362 https://doi.org/10.1016/S0167-5060(08)70743-X
- Miller, J., and A. Roth, 'Executive Summary of the 1988 North American Manufacturing Futures Survey,' Boston University Roundtable, Manufacturing, 1988
- Ohno, T., Toyota Production System: beyond Large-Scale production, Productivity Press, Cambridge, 1988
- Porteus, E. V., 'Optimal Lot Sizing, Process Quality Improvement and Setup Cost Reduction,' Operations Research 34, 1 (1986), 137-144 https://doi.org/10.1287/opre.34.1.137
- Rees, L. P., P. R. Philipoom, B. W. Taylor, and P. Y. Huang, 'Dynamically Adjusting the Number of Kanbans in a Just-in-Time production System Using Estimated Values of Lead Time,' IIE Transactions 19, 2 (1987), 199-207 https://doi.org/10.1080/07408178708975387
- Ross, S. M., Introduction to Probability Models, Academic Press, San Diego, 1989
- Seidmann, A. and M. Smith, 'Due Date Assignment for Production Systems,' Management Science 27, 4 (1981), 401-413
- Spence, A. M. and E. V. Porteus, 'Setup Reduction and Increased Effective Capacity,' Management Science 33, 10 (1987), 1291-1301 https://doi.org/10.1287/mnsc.33.10.1291
- So, K. C. and S. C. Pinault, 'Allocating Buffer Storages in a Pull System,' International Journal of Production Research 26, 12 (1988), 1959-1980 https://doi.org/10.1080/00207548808948008
- Zipkin, P. H., 'Models for Design and Control of Stochastic Multi-Item Batch Production Systems,' Operations Research 34, 1 (1986), 91-104 https://doi.org/10.1287/opre.34.1.91