Abstract
Den have been many construction projects in urban n We have a lot of problems which have to be solved especially against residence complaints existing building damage due to construction worts. We sometimes have to pay a certain amount of cost to solve the above problem, not in planning. In addition to, we have to suffer from work delay due to confronting problem. Almost all of these are due to blasting work to break solid rock to be excavated. Therefore, this study is focused on finding out how to reduce noise more cheaply. Four cases(4) as cheaper but more effective way have been tested to find out which way of local fence will have better moise reduce function in a field site. Where five(5) large breakers are being operated. It is concluded that more form and shape of local movable panel than the site of panel can be influenced on noise reduce.