Abstract
This paper presents a substation expansion planning method with quantitative analysis using ANP. To calculate the reliability factor and economy factor of the system, reliability indices and total construction cost is used. With these factors, new ANP model which select the best plan either economy or reliability among various alternatives is developed. This model can assist the decision making for the system planner. The usefulness of the method is verified by applying it to the large-scaled distribution system.