References
- Anderson, E. J. and Nyirenda. J. C. (1990), Two New Rules to Minimize Tardiness in a Job Shop, International Journal of Production Research. 28, 2277-2292
- Baker, K. R. (1995), Elements of Sequencing and Scheduling, Paperback
- Cheng, T. C. E. and Gupta, M. C. (1986), Survey of Scheduling Research Involving Due Date Determination Decision, European Journal of Operational Research. 38, 156-166
- Connors, D. P. and Yao, D. D. (1996), Methods for Job Configuration in Semiconductor Manufacturing, IEEE Trans. on Semi-conductor Manufacturing, 9, 401-411
- Chun, K. W. and Hung, Y. S. (1996), Batch Sizing Heuristic for Batch Processing Workstations in Semiconductor Manufacturing, Journal of the Korean Institute of Industrial Engineers. 22, 231-245
- Glassey, C. R. and Resende, M. C. G. (1988), A Scheduling Rule for Job Release in Semiconductor Fabrication, Operations Research Letters, 7, 213-217
- Glassey, C. R. and Resende, M. C. G. (1988), Closed-loop Job Release Control for VLSI Circuit Manufacturing, IEEE Trans. on Semiconductor Manufacturing, 1, 36-46
- Kim, Y. D., Kim, J. U., Lim, S. K. and Jun, H. B. (1998), Due-date Based Scheduling and Control Policies in a Multi-Product Semiconductor Wafer Fabrication Facility, IEEE Trans. on Semiconductor Manufacturing, 11, 155-164
- Lee, K. H., Hong, Y. S. and Kim, S. Y. (1995), Production Scheduling in Semiconductor Wafer Fabrication Process, Journal of the Korean Institute of Industrial Engineers. 21, 357-369
- Lee, Y. H., Park, J. K. and Kim, S. Y. (2002), Experimental Study on Input and Bottleneck Scheduling for a Semiconductor Fabrication Line, IIE Transactions. 34, 179-190
- Sun, D. and Lin, L. (1994), A Dynamic Job Shop Scheduling Framework : a Backward Approach, International Journal of Production Research, 32, 967-985
- Uzsoy, R., Lee, C. and Martin-Vega, L. A. (1992), A View of Production Planning and Scheduling Models in the Semiconductor Industry. Part I: System Characteristics, Performance Evaluation and Production Planning, IEE Trans. on Scheduling and Logistics, 24, 47-60
- Uzsoy, R., Lee, C. and Martin-Vega, L. A. (1994), A View of Production Planning and Scheduling Models in the Semiconductor Industry. Part II :Shop-Floor Control, IEE Trans. on Scheduling and Logistics, 26, 44-55
- Wein, L. M. (1988), Scheduling Semiconductor Wafer Fabrication, IEEE Trans. on Semiconductor Manufacturing. 1, 115-130
- Wein, L. M. and Chevalier, P. B. (1992), A Broader View of the Job-shop Scheduling Problem, Management Science, 38, 1018-1033
- Yea, S. H. and Kim, S. Y. (1997), Shift Scheduling in Semiconductor Wafer Fabrication, IE Interfaces. 10, 1-14
- Yoon, H. J. and Lee, D. Y. (1999), Real-Time Scheduling of Wafer Fabrication with Multiple Product Types, Proceeding of the 1999 IEEE International Conference on Systems, Man and Cybernetics, 835-840