CONWIP 통제방식에 의해 운영되는 다품목 생산시스템의 성능평가

Performance Evaluation of a Multi - Item Production System Operated by the CONWIP Control Mechanism

  • 박찬우 (경희대학교 기계.산업시스템공학부) ;
  • 이효성 (경희대학교 기계.산업시스템공학부) ;
  • 김창곤 (한국해양수산 개발원)
  • Park, Chan-Woo (School of Mechanical and Industrial Systems Engineering, Kyung Hee University) ;
  • Lee, Hyo-Seong (School of Mechanical and Industrial Systems Engineering, Kyung Hee University) ;
  • Kim, Chang-Gon (Port Information and Information System, Korea Maritime Institute)
  • 발행 : 2002.03.31

초록

We study a multi-component production/inventory system in which individual components are made to meet various demand types. We assume that the demands arrive according to a Poisson process, but there is a fixed probability that a demand requests a particular kit of different components. Each component is produced by a flow line with several stations. The production of each component is operated by the CONWIP control mechanism. To analyse this system, we propose an approximation method based on aggregation method. In application of the aggregation method, a product-form approximation technique as well as a matrix-geometric method is used. Comparisons with simulation show that the approximation method provides fairly good results.

키워드

참고문헌

  1. Baynat, B. and Dallery, Y. (1993), a Unified View of Product-Form Approximation Techniques for General Closed Queueing Networks, Performance Evaluation, 18, 205-224
  2. Cheung, K. L. and Hausman, W.H. (1995), Multiple Failures in a Multi-Item Spares Inventory Model, lIE Transactions, 27, 171-180
  3. Duenyas, I. and Hopp, W. J. (1992), CONWIP Assembly System with Deterministic Processing and Random Outages, lIE Transactions, 24(4),97-111
  4. Duenyas. I. and Hopp, W. J. (1993), Estimating the Throughput of an Exponential CONWIP Assembly System, Queueing System, 14,135-157
  5. Duenyas, I., Hopp, W.J. and Spearman, M. L. (1993), Characterizing the Output Process of a CONWIP Line With Deterministic Processing and Random Outages, Management Science, 39(8), 975-988 https://doi.org/10.1287/mnsc.39.8.975
  6. Gattorna, J. (1998), Strategic Supply Chain Alignment, Gower, Hampshire, England
  7. Glasserman, P. and Wang, Y.(1998), Leadtime-Inventory Trade-Offs in Assemble to Order Systems, Operations Research, 46(6), 858-871 https://doi.org/10.1287/opre.46.6.858
  8. Harrison, P. G. and Patel, N. M. (1992), Performance Modeling of Communication Networks and Computer Architectures, Addison-Wesley, Seoul, Korea
  9. Hausman, W. H.(1982), On Optimal Repair Kits under a Job Completion Criterion, Management Science, 28(11), 1350-1351 https://doi.org/10.1287/mnsc.28.11.1350
  10. Lee, H. L. and Billington, C. (1993), Material Management in Decentralized Supply Chains, Operations Research, 41(5), 835-847 https://doi.org/10.1287/opre.41.5.835
  11. Lee, H. S. and Lee, J. E. (1998), Approximate Analysis of a CONWIP system with a Lot Production, Journal of the Korean Institute of industrial Engineers, 11(3), 53-64
  12. Lee, J. E. and Lee, H. S. (1998), Approximate Analysis of a CONWIP system with Compound Poisson Demands, Journal of the Korean Operations Research and Management Science, 23(3), 153-168
  13. Mamer, J.W. and Smith, S.A. (1982), Optimizing Field Repair Kits Based on Job Completion Rate, Management Science, 28(11), 1328-1333 https://doi.org/10.1287/mnsc.28.11.1328
  14. Mascolo, M. D., Frein, Y. and Dallery, Y. (1996), an Analytical Method for Performance Evaluation of Kanban
  15. Controlled Production Systems, Operations Research, 44(1),50-64
  16. Marie, R A (1979), an Approximate Analytical Method for General Queueing Networks, IEEE Trans. Soft, Eng., SE-5(5), 530-538
  17. Neuts, M. F. (1981), Matrix Geometric Solutions in Stochastic Models-an Algorithmic Approach, John Hopkins University Process, Baltimore
  18. Smith, S.A, Chambers, J.C. and Shlifer, E. (1980), Optimal Inventories Based on Job Completion Rate for Repairs Requiring Multiple Items, Management Science, 26(8), 849-852 https://doi.org/10.1287/mnsc.26.8.849
  19. Song, J. S. (1998), On the Order Fill Rate in a Multi-item, Base Stock Inventory System, Operations Research, 46(6),831-845 https://doi.org/10.1287/opre.46.6.831
  20. Song, J. S., Xu, S. H. and Lin, B. (1999), Order-Fulfillment Performance Measures in an Assemble-to-Order System with Stochastic Leadtimes, Operations Research, 47(1),131-149 https://doi.org/10.1287/opre.47.1.131
  21. Spearman, M. L., Woodruff, D. L. and Hopp, W. J. (1990), CONWIP: a Pull Alternative to Kanban, Int. J. Prod. Res., 28(5), 879-894 https://doi.org/10.1080/00207549008942761