Architectural Programming via Post Occupancy Evaluation: Case of Steel Framed School Building Seowha and Galma Primary School

학교시설(學校施設) 거주평가(居住評價)에 따른 건축기획(建築企劃) 개선(改善) - 철골조학교(鐵骨造學校) 프로젝트 서화.갈마초등학교(初等學校)의 경우(境遇)

  • Published : 2001.05.15

Abstract

The study is a Post-Occupancy-Evaluation on newly constructed steel framed school buildings sponsored by POSCO, and presents alternative tactics for planning and programming for the kind of project. The schools in concern are Seowha Primary School(Incheon city) and Galma Primary School(Daejeon city) which were completed in February 1999 and since occupied. The POE-2000 study results had to be compared to the POE-1999 which dealt on Jigog Primary School(Pohang city) and Iwol Primary School(Jincheon township) to develop an improved project tactics. In this reason we had to use the same questionnaire forms envisaged by the former study, ie. POE-1999. To begin with the same study format, it might be appropriate to differentiate whether a 'satisfaction' comes from the 'steel framed construction' or from the 'newly built environment'. However it was difficult with the POE-1999. As the intention to compare the 4 school building were the firstly achieved objective of this study that we had to continue to apply the same format and the analysis procedure. Except this condition, everything the POE-1999 conducted were valuable to this POE-2000. The satisfaction survey form includes 36 questions for individual items and 2 questions for general items.

Keywords