소수력발전 성능특성 분석기법 연구

Performance Analyzing Technique of Small Hydro Power

  • 발행 : 2001.03.31

초록

A methodology to predict the output performance of small hydro power using discharge of sewage treatment plant has been studied. Two sewage treatment plants existing in Chunrabuk-Do were selected and the output performance characteristics for these plants were analyzed, using developed model. As a result, it was found that the developed model in this study can be used to analyze the output characteristics for small hydro power using discharge of sewage treatment plant. Additionally, primary design specifications such as design flowrate, capacity, operational rate and annual electricity production were estimated and discussed for two plants.

키워드