Treatment of Wastewater from Agricultural Industrial Complex by Combination of Electrochemical and Activated Sludge Process Systems

전기화학적 방법과 활성오니 공정의 병합에 의한 농공단지폐수 처리

  • Lee, Hong-Jae (Division of Applied Life Sciences, Gyeongsang National University) ;
  • Seo, Dong-Cheol (Division of Applied Life Sciences, Gyeongsang National University) ;
  • Cho, Ju-Sik (School of Environment and Agricultural Science, Sunchon National University) ;
  • Park, Hyun-Geoun (Dept. of Environmental Engineering, Chinju National University) ;
  • Lee, Chun-Sik (Dept. of Environmental Engineering, Chinju National University) ;
  • Heo, Jong-Soo (Division of Applied Life Sciences, Gyeongsang National University)
  • 이홍재 (경상대학교 응용생명과학부) ;
  • 서동철 (경상대학교 응용생명과학부) ;
  • 조주식 (순천대학교 환경농업과학부) ;
  • 박현건 (진주산업대학교 환경공학과) ;
  • 이춘식 (진주산업대학교 환경공학과) ;
  • 허종수 (경상대학교 응용생명과학부)
  • Published : 2001.12.30

Abstract

The effects of HRT and effluent time on removals of pollutants in the electrochemical pilot were investigated. COD removal after 8 hour electrochemical reaction time in HRT 30 and 60 minutes were higher than that of 15 minute HRT. Turbidity removal was 90% or greater regardless of conditions during effluent time. Removals of T-N and T-P during effluent time in HRT 30 and 60 minutes were $71{\sim}74%$ and $85{\sim}98%$, respectively. To evaluate the combination of activated sludge process and continuous electrochemical as pretreatment, the removal efficiencies of pollutants was investigated. In two treatment processes of a single activated sludge system and a electrolysis pilot plus activated sludge systems, SVI and MLSS during effluent time were kept with $82{\sim}112$ and $1,230{\sim}1,750$ mg/L, respectively. COD removal was approximately 90% at early effluent time for both treatment systems, but COD removal in a single activated sludge was slightly decreased as effluent time went by, compared with the single activated sludge COD removal was slightly increased in the early stage of the electrolysis plus activated sludge system. Turbidity removal during effluent time was higher than 95% for both treatment systems. T-N removals during effluent time in a single activated sludge system and a electrolysis pilot plus activated sludge systems were $62{\sim}74%$ and $72{\sim}86%$, respectively. T-P removal in a electrolysis pilot plus activated sludge systems was increased by 9% at early effluent time and 15% after 72 hours of effluent time in compared with a single activated sludge system.

농공단지 폐수의 효과적인 처리를 위하여 스테인레스 전극판을 이용한 전기화학적 방법에 의한 pilot 실험 및 pilot 전기화학반응조를 생물공정의 전처리 과정으로 도입하여 이들 두 공정을 연계처리 실험을 하여 오염물질 제거효율을 조사하여, 이들 두 공정의 연계가능성을 조사한 결과는 다음과 같다. 전기화학방법에 의한 pilot 실험장치에서의 체류시간별 유출시간에 따른 COD 처리율은 체류시간 30분 및 60분에서 유출시간 8시간 이후부터 약 $78{\sim}81%$로 체류시간 15분으로 하였을 경우에 비해 그 처리율이 높았고, 탁도 처리율은 모든 조건에서 전기반응시간 초기부터 90%이상이었다. T-N 및 T-P 처리율은 체류시간 30 및 60분에서 유출 전 기간 동안 처리율이 각각 약 $71{\sim}74$$85{\sim}98%$로서 체류시간 15분에 비해 약간 높았다. 전기화학적 처리공정을 생물학적 처리공정의 전처리과정으로 도입한 실험과 단독 생물학적 처리공정의 실험을 동시에 실시한 결과에서의 SVI 및 MLSS의 농도변화는 유출 전 기간 동안 두 처리 공정 모두 각각 약 $82{\sim}112$$1,230{\sim}1,750$ mg/L로서 전반적으로 안정한 경향이었으며, SVI는 안정범위인 $50{\sim}150$을 충족시켰다. COD 처리율은 두 처리공정 모두 유출초기에 약 90%로 높았고 유출시간이 경과할수록 단독 활성슬러지 공정에서는 처리율이 미미하게 감소하였으나 전기화학반응조와 활성슬러지 공정을 연계한 처리공정에서는 미미하게 증가하여, 유출시간 72시간 후 COD 처리율은 각각 약 87 및 95%로서 전기화학반응조와 활성슬러지 공정을 연계한 처리공정에서 약 8% 증가하였다. 탁도 처리율은 두 처리공정 모두 유출 전 기간 동안 약 95%이상 높게 처리되었다. T-N 처리율은 유출 전 기간 동안 단독 활성슬러지 공정 및 전기화학반응조와 활성슬러지 공정을 연계한 처리공정에서 각각 약 $62{\sim}74$$72{\sim}86%$로서 연계한 공정에서 T-N 처리율이 10%이상 증가되었다. T-P 처리율은 전기반응조와 활성슬러지 공정을 연계한 처리공정에서 단독 활성슬러지 공정에 비해 유출 72시간후에는 각각 약 97 및 82%로서 전기화학반응조와 활성슬러지 공정을 연계한 처리공정이 약 15%이상 높았다.

Keywords