폐기물 해상매립장의 도입방안에 관한 연구 - 장래 수도권 지역의 매립폐기물 처리를 중심으로 -

Research for Construction of Landfills at Sea Disposal of Wastes to be Reclaimed in the Metropolitan Area in the Future

  • 정공일 (주식회사 한아엔지니어링) ;
  • 김영수 (주식회사 한아엔지니어링)
  • 발행 : 2001.05.01

초록

The quantity of waste has been increased due to the increase in population and consumption after industrialization. Accordingly it caused the urban environmental problems, the lack of landfill and the pollution around the landfill. Thus, it is necessary to research the adequate alternative in the long-term. In case of Japan, areas and quantities of landfills at sea are more great than those of landfills in land. And investigating our condition, landfills of the metropolitan area in land are to be fully filled with wastes up to 2020 and be closed. In this research, construction of landfill sites at sea is suggested as the alternative waste disposal method and it is suggested that in our country, the suitable landfill sites of the metropolitan area are the regions around Jangbong-do Island and Muei-do Island. It is expected that the best way to transport wastes is to transport through Kyungin canal from the middle collection center to the lower Han River. Rough cost for construction of landfill at sea, if it is used for 50 years, is expected to be 2 trillion won and total time to construct the landfill is expected to be 10 years. Many studies concerning to this research proposal are to be performed so that construction of landfills familiar to environment are to be accomplished.

키워드