ILOG를 이용한 항공기 운항 일정계획 시스템 개발에 관한 연구

A Study on Development of the Aircraft Scheduling System Using ILOG

  • 윤종준 (인하대학교 산업공학과) ;
  • 이장춘 (대우정보 시스템 기술연구소) ;
  • 이화기 (인하대학교 산업공학과)
  • 발행 : 2001.06.01

초록

In this paper, the aircraft route scheduling consists of two steps; the pairing generation and the aircraft assignment. The pairing generation is heuristic approach how flights construct pairings from and to the main base. The aircraft resource assignment which is to establish a aircraft route schedule is constructed by constraint satisfaction problem technique. ILOG solver and schedule is used to solve this problem. In addition, a aircraft route reschedule process against departure-arrival delay or aircraft maintenance schedule change is added by partial constraints satisfaction problem technique. Also, Gantt chart made by ILOG views is used to show aircraft route schedule results more easily.

키워드