Abstract
For the productivity improvement, it is necessary to analyze problem of the system and evaluate alternative plans. But, it if hard to experiment and evaluate alternative plans in real existing system. Therefore, it is necessary to synthetically analyze and evaluate alternative plans using simulation and statistical analysis method. In this case study, as a simulation language, Promodel is used to compare and evaluate four alternatives which are considered to improve the productivity of an object system. The object system is constituted of a pretreatment line and a painting line. The purpose of this study is to analyze whether the decrease of the down time in pretreatment line can be effective to the productivity improve comparing with exiting system and other alternatives. The other purpose is to choose an alternative that has the best productivity improvement. The results of the simulation show that the possibility of improvement in productivity by decreasing the down time of pretreatment line. Two-Stage Bonferroni Procedure is used to choose the best alternative.