Optimal Design of Batch-Storage Network with Finite Intermediate Storage

저장조 용량제약이 있는 회분식 공정-저장조 그물망 구조의 최적설계

  • Published : 2001.10.01

Abstract

The purpose of this study is to find analytic solution of determining the optimal capacity (lot-size) of multiproduct acyclic multistage production and inventory system to meet the finished product demand under the constraint of finite intermediate storage. Intermediate storage is a practical way to mitigate the material flow imbalance through the line of supply and demand chain. However, the cost of constructing and operating storage facilities is becoming substantial because of increasing land value, environmental and safety concern. Therefore, reasonable decision-making about the capacity of processes and storage units is an important subject for industries. The industrial solution for this subject is to use the classical economic lot sizing method, EOQ/EPQ(Economic Order Quantity/Economic Production Quantity) model, incorporated with practical experience. But EOQ/EPQ model is not suitable for the chemical plant design with highly interlinked processes and storage units because it is developed based on single product and single stage. This study overcomes the limitation of the classical lot sizing method. The superstructure of the plant consists of the network of serially and/or parallelly interlinked non-continuous processes and storage units. The processes transform a set of feedstock materials into another set of products with constant conversion factors. A novel production and inventory analysis method, PSW(Periodic Square Wave) model, is applied to describe the detail material flows among equipments. The objective function of this study is minimizing the total cost composed of setup and inventory holding cost. The advantage of PSW model comes from the fact that the model provides a set of simple analytic solutions in spite of realistic description of the material flows between processes and storage units. the resulting simple analytic solution can greatly enhance the proper and quick investment decision for the preliminary plant design problem confronted with economic situation.

Keywords

References

  1. R. C. Ross, 'How much tankage is enough?,' Hydrocarbon Processing, Aug., 1973
  2. I. A. Karimi and G. V. Reklaitis, 'Optimal selection of intermediate storage tank capacity in a periodic batch,' Semicontinous Process, AIChE J., vol. 29, no. 4, p. 588, 1983 https://doi.org/10.1002/aic.690290411
  3. I. A. Karimi and G. V. Reklaitis, 'Intermediate storage in noncontinuous processes involving stages of parallel units, AIChE J., vol. 31, no. 1, p. 44, 1985 https://doi.org/10.1002/aic.690310104
  4. I. A. Karimi and G. V. Reklaitis, 'Deterministic variability analysis for intermediate storage in noncontinuous processes: Part I: Allowability conditions,' AIChE J., vol. 31, no. 9, p. 1516, 1985 https://doi.org/10.1002/aic.690310915
  5. I. A. Karimi and G. V. Reklaitis, 'Deterministic variability analysis for intermediate storage in noncontinuous processes: Part II: Storage sizing for serial systems,' AIChE J., vol. 31, no. 9, p. 1528, 1985 https://doi.org/10.1002/aic.690310916
  6. E. S. Lee and G. V. Reklaitis, 'Intermediate storage and operation of batch processes under batch failure,' Computers & Chem. Eng., vol. 13, no. 4/5, p. 491, 1988 https://doi.org/10.1016/0098-1354(89)85031-8
  7. E. S. Lee and G. V. Reklaitis, 'Intermediate storage and the operation of periodic processes under equipment failure,' Computers & Chem. Eng., vol. 13, no. 11/12, p. 1235, 1989 https://doi.org/10.1016/0098-1354(89)87029-2
  8. J. A. Muckstadt and R. O. Roundy, 'Analysis of multistage production systems,' S. C. Graves et al., eds. Logistics of Production and Inventory. North-Holland Amsterdam, p. 59, 1993
  9. G. Yi and G. V. Reklaitis, 'Optimal design of multiple batch units with feedstock/product storages,' Chem. Eng. Comm., vol. 181, p. 79, 2000 https://doi.org/10.1080/00986440008912817
  10. 이경범, '준비비와 재고비를 고려한 직렬 비연속 공정과 중간 저장조의 최적설계,' 제어 자동화 시스템 공학회 논문지, 제3권, 제4호, pp. 398-405, 1997. 8
  11. 이경범, '원료 및 제품 저장조를 포함하는 병렬 비연속 공정의 최적설계,' 제어ㆍ자동화ㆍ시스템 공학회 논문지, 제3권, 제5호, pp. 532-541, 1997. 10
  12. 이경범, 이의수, '회분식 공정-저장조 그물망 구조의 최적설계,' 제어ㆍ자동화ㆍ시스템 공학회 논문지, 제4권, 제6호, pp. 802-810, 1998. 12