Abstract
Through the modeting study on the groundwater now system around the underground stockpile site of crude oil near Seoul, we carried out the research on the influence of the groundwater yield near the site, the effect of the water curtain construction in order to reduce the influence of water yield, and the realized case study by measuring the water level change after the construction of the water curtain. For the simu1ation of the water yield and the water curtain, the nwnerical analysis code, MODFLOW has been utilized. Groundwater levels of the observation wells which were established to observe the hydraulic head around underground oil storage cavern of the study area have been changed in the range of from EL.+30 to +60 meter, while the simulation study revealed that groundwater levels changed in the range of from EL.+20 to +5Om. The hydrogeological condition of the underground oil storage cavern becomes stable by injection water to maintain the groundwater level around the cavern. The result shows the proper input of the hydrogeological factors helps the management to be effective for the oil stockpile site.
서울 근교의 화강편마암지역 지하 석유비축기지 주변 지하수계 모델링 연구를 통하여, 기지 인근에서 지하수를 개발할 때의 영향 및 지하수 개발의 악영향 저감을 위한 수벽공 설치의 효과 등을 파악하고, 실제 설치 후의 영향을 측정하여 모델링 결과와 비교 분석하므로서 기지의 관리 및 운영에 참고하고자 하였다. 심부 지하수를 개발한 경우의 기지 주변의 지하수 유동체계 분석, 그리고 이 개발 위치와 기지 사이에 수벽공을 설치했을 경우의 유동체계를 MODFLOW 수치해석방법으로 분석하였다. 기지 주변 관측공의 실제 지하수위는 EL.+30∼60m 범위에서 변동하며, 모델링 결과는 EL.+20∼50m 범위에서 변동하여 유사한 양상을 보이고 있다. 지하수 개발에 의해 기지 주변의 수위가 하강하였다가 수벽설치 후에 회복되었음을 수치해석을 통해 확인할 수 있었다. 지하지질구조 및 수리지질 요소를 적절히 입력하고 효과적인 모델링 연구를 수행하여 기지의 운영에 기여하였음을 확인하였다.