A Case Study on Determining the Number of Spare Modules in Power Plant Control System Used for Long Term

장기사용 발전소 제어시스템의 예비모듈 수 결정 사례

  • 정창기 (전력연구원 발전연구실 발전계전그룹) ;
  • 신윤오 (전력연구원 발전연구실 발전계전그룹) ;
  • 박정원 (산업기술시험원 기술감리본부 신뢰성평가팀) ;
  • 함중걸 (산업기술시험원 기술감리본부 신뢰성평가팀)
  • Published : 2000.03.01

Abstract

When an electronic control system has been used for long time, the electronic control system becomes obsolete and no longer In production. In this case, the existing control system should replace by new system due to shortage of spare modules. However, if the proper number of spare modules are stocked, it may be possible and more economical than to replace by new system to extend the usage period of the existing control system. In this case, it is an important problem to determine the proper number of spare modules. In this paper, a method to determine the proper number of spare modules is presented with an application example.