Abstract
A two-phase anaerobic digestion system for the treatment of swine waste was constructed in a commercial hog farm. The digester system was composed of 4 major units; slurry storage pit, acidogenic digester, methanogenic digester and sedimentation pit. A biogas boiler unit was also attached to maintain the digester temperature of 37$^{\circ}C$. Substrate lading was made with 2hr-interval by pumping about 2.1$m^3$ of slurry type swine waste from the slurry pit into the acidogenic digester, which corresponds to hydraulic retention time of 4 days for the acidogenic digester and of 11 days for the methanogenic digester. Digester temperature were well maintained as the set temperature of 37$^{\circ}C$ in the methanogenic digester, while the temperature in the acidogenic digester showed around 34$^{\circ}C$. pH also showed a steady-state results of 7.3 in the acidogenic digester and of 7.6 in the methanogenic digester during the operation period. Average biogas production rate was 0.66$m^3$/$m^3$ digester volume. Reduction rate of total solid and volatile solid were 42.8% and 5.8%, respectively. Total nitrogen and ammonia nitrogen were not reduced during the anaerobic fermentation, however, most of VFAs seemed to be converted to the biogas,. These fermentation performance data may suggest that he newly developed a two-phase anaerobic digester for the swine waste treatment worked so successfully.