A Study on the Effectiveness of Protective Capacity in a Re-entrant Line

재투입 생산라인에서 방어적 생산능력의 효과성에 관한 연구

  • 김선민 (서울산업대학교 산업경영학과) ;
  • 강현곤 (연세대학교 경법대학 경영학과)
  • Published : 2000.05.01

Abstract

This paper addresses the effect of protective capacity on the lead time and throughput of a re-entrant line where statistical fluctuations exist in the form of variation in processing times and machine breakdowns. The specific framework employed in the paper is a five station re-entrant line structured as a closed network mode. This paper argues that protective capacity can be used in conjunction with WIP inventory in order to reduce the lead time and to increase the increase the throughput of a line. Simulation analyses are included to give insight into the effectiveness of protective capacity.

Keywords