Abstract
This paper presents reasonable evaluation technique to determine system configuration of underground distribution system. To set up reasonable evaluation for a certain object region, it is necessary for methodology to access accurately factors such as economics, reliability, customer interruption cost, implementation and flexibility about proposed various configuration of underground distribution system. But it is difficult to evaluate factors as above-mentioned since there is no criterion to assess them in our country. Accordingly, having completed the technical and economical analysis and customer interruption cost of various types of system, this paper presents the most reasonable results to get the optimal configuration of underground distribution system. Also, this paper presents possible methodology which can be applied other areas having a different load characteristics by application actually making a selection Myungdong as sample area.