References
- 임성진, 이두용, 1997, '페트리네트를 이용한 유연생산시스템의 다중목표 스케쥴링,' 대한기계학회논문집(A), 제21권, 제5호, pp. 769-779
- Gere, W. S., 1966, 'Heuristics in Job Shop Scheduling,' Management Science, Vol. 13, No. 3, pp. 167-190
- Banaszak, Z. and Krogh, B., 1990, 'Deadlock Avoidance in Flexible Manufacturing Systems with Concurrently Competing Process flows,' IEEE Transactions on Robotics and Automation, Vol. 6, No. 6, pp. 724-734 https://doi.org/10.1109/70.63273
- Viswanadham, N., Narahari, Y. and Johnson, T. L., 1990, 'Deadlock Prevention and Deadlock Avoidance in Flexible Manufacturing Systems Using Petri Net Models,' IEEE Transactions on Robotics and Automations, Vol. 6, No. 6, pp. 713-723 https://doi.org/10.1109/70.63257
- Wysk, R. A., Yang, N. S. and Joshi, S., 1991, 'Detection of Deadlocks in Flexible Manufacturing Cells,' IEEE Transactions on Robotics and Automations, Vol. 7, No. 6, pp. 853-859 https://doi.org/10.1109/70.105378
- Fanti, M. P., Maione, B., Mascolo, S. and Turchiano, B., 1991, 'Event-Based Feedback Control for Deadlock Avoidance in Flexible Production Systems,' IEEE Transactions on Robotics and Automations, Vol. 13, No. 3, pp. 347-363 https://doi.org/10.1109/70.585898
- Lawley, M. A., 1999, 'Deadlock Avoidance for Production Systems with Flexible Routing,' IEEE Transactions on Robotics and Automations, Vol. 15, No. 3, pp. 497-509 https://doi.org/10.1109/70.768182
- Wu, N., 1999, 'Necessary and Sufficient Conditions for Deadlock-Free Operation in Flexible Manufacturing Systems Using a Colored Petri Net Model,' IEEE Transactions on Systems, Man, and Cybernetics-Part C: Applications and Reviews, Vol. 29, No. 2, pp. 192-204 https://doi.org/10.1109/5326.760564
- Ramaswamy, S. E. and Joshi, S. B., 1996, 'Deadlock-Free Schedules for Automated Manufacturing Workstations,' IEEE Transactions on Robotics and Automations, Vol. 12, No. 3, pp. 391-400 https://doi.org/10.1109/70.499821
- Bean, J. C., 1994, 'Genetic Algorithms and Random Keys for Sequencing and Optimization,' ORSA Journal on Computing, Vol. 6, No. 2, pp. 154-160
- Kirkpatrick, S., Gelatt, C. D. and Vecchi, M. P., 1983, 'Optimization by Simulated Annealing,' Science, Vol. 220, pp. 671-680 https://doi.org/10.1126/science.220.4598.671
- Hoitomt, D. J., Luh, P. B. and Pattipati, K. R., 1993, 'A Practical Approach to Job-Shop Scheduling Problems,' IEEE Trans. on Robotics and Automation, Vol. 9, No. 1, pp. 1-13 https://doi.org/10.1109/70.210791
- Kim, J. U. and Kim, Y. D., 1996, 'Simulated Annealing and Genetic Algorithms for Scheduling Products with Multi-Level Product Structure,' Computers Ops Res., Vol. 23, No. 9, pp. 857-868 https://doi.org/10.1016/0305-0548(95)00079-8
- Jain, A. S. and Meeran, S., 1999, 'Deterministic Job-Shop Scheduling : Past, Present and Future,' European Journal of Operational Research, Vol. 113, pp. 390-434 https://doi.org/10.1016/S0377-2217(98)00113-1
- Van Laarhoven, P. J. M., Aarts, E. H. L. and Lenstra, J. K., 1992, 'Job Shop Scheduling by Simulated Annealing,' Operations Research, Vol. 40, No. 1, pp. 113-125