A Study on the Erection Scheduling in the Shipbuilding Using Constraint Satisfaction Technique

제약 만족 기법을 이용한 조선 산업에서의 탑재 일정 생성에 관한 연구

  • 김기동 (강원대학교 산업공학과) ;
  • 장용성 (강원대학교 대학원 산업공학과)
  • Published : 1999.12.31

Abstract

The dock is the most important resource in shipbuilding yard. Among the shipbuilding schedules, the ship erection schedule in a dock is preferentially built. As results of it, the other schedules(machining in plants, block assembly, pre-painting, pre-rigging, painting and etc) are made. In this study, ship erection scheduling is formulated using ILOG Scheduler. This study is to develop a new problem solving method for ship erection to make an effective schedule based on Constraint Satisfaction Technique(CST).