강합성형 교량의 합리적인 타설방법과 순서에 관한 연구

The Reasonable Concrete-Placing Methods and Sequences of Composite Steel Bridge

  • 투고 : 1999.04.07
  • 발행 : 1999.04.30

초록

Recently, unexpected cracks in the concrete deck slab of composite steel bridges have been widely reported at an early age of concrete placing due to the concrete placing sequence and methods. Accordingly, the analytical research was carried out to verify the negative moment at an internal supports due to the several concrete pouring sequence and to determine the reasonable concrete placing method on the deck slab of composite steel bridge. The results show that the conventional concrete-placing method, which pours concrete first on the positive moment regions and then negative regions, leads to the minimum moment at an internal supports. However, the conventional method produces two impractical construction joints on every spans and makes field engineer to pour concrete continuously. In conclusion, this concrete-placing method was verified to be reasonable only when the construction joint was placed at the $\frac{5}{8}l{\sim}\frac{6}{8}l$ location of the middle span.

키워드