Abstract
When there exists a fault zone ahead of the tunnel face and a tunnel is excavated without perceiving its existence, it will cause stress concentration in the region between the tunnel face and the fault zone because of the influence of the fault zone on the arching phenomena. Because the underground structure has many unreliable factors in the design stage, the prediction of a fault zone ahead of the tunnel face by monitoring plans during tunnel construction and the rapid establishment of appropriate support system are required for more economical and safer tunnel construction. Recent study shows that longitudinal displacement changes during excavation due to the change of rock property, and if longitudinal displacement and settlement, which are measured in the field, are considered together in displacement analysis, the prediction of change in rock mass property is possible. This study provided the method for the prediction of fault zones by analyzing the changes of L/C and (Ll-Lr)/C ratio (L= longitudinal displacement at crown, C = settlement at crown, Ll = longitudinal displacement at left sidewall, Lr = longitudinal displacement at right sidewall) and the stereographic projection of displacement vectors which were obtained from the 3-D numerical analysis of hybrid method in various initial stress conditions.
막장 전방에 파쇄대 등의 불연속면이 존재할 경우, 이를 미리 예측하지 못한채로 굴진을 하게 되면 파쇄대로 인해 터널 굴진에 따라 발생된 종방향 아칭에 영향을 주어 막장면 전방에 응력이 집중하게 된다. 터널 및 지하공간의 설계시에는 불확실한 설계요소를 과다하게 내포하고 있으므로 경제적이고 안정성이 확보된 터널 시공을 위해서는 터널 막장면에서의 정확한 계측으로 막장 전방의 파쇄대를 예측하여 터널 지보체계에 신속히 대비함이 필요하다. 최근의 연구결과에 의하면 3차원 절대변위계측에 의해 터널의 시공 시 굴진에 따라 지반의 강도차이로 인해 발생된 종방향 변위의 변화를 측정하여 막장 전방의 불연속면을 미리 예측할 수 있다고 하였다. 본 연구는 혼합법을 사용한 3차원 수치해석으로부터 얻어지는 변위로부터 L/C (천단부의 종방향 변위[L]와 천단부의 침하량[C]의 비 )와 S/C (측벽의 수평방향 변위[S]와 천단부의 침하량[C]의 비), (Ll-Lr)/C (좌측벽의 종방향변위[Ll]와 우측벽의 종방향변위[Lr]의 차와 천단부의 침하량[C]의 비), 평사투영법을 중심으로 지반에 파쇄대가 존재할 경우에 대해 여러 가지 초기 지중응력조건에서 터널 굴착에 따른 3차원 절대 변위를 분석하여 그 존재를 예측할 수 있는 기법을 제시하였다.