Journal of Korean Society of Industrial and Systems Engineering (산업경영시스템학회지)
- Volume 22 Issue 51
- /
- Pages.189-197
- /
- 1999
- /
- 2005-0461(pISSN)
- /
- 2287-7975(eISSN)
The development of critical node method based heuristic procedure for Solving fuzzy assembly-line balancing problem
퍼지 조립라인밸런싱 문제 해결을 위한 주노드법에 기초한 휴리스틱 절차 개발
Abstract
Assembly line balancing problem is known as one of difficult combinatorial optimization problems. This problem has been solved with linear programming, dynamic programming approaches. but unfortunately these approaches do not lead to efficient algorithms. Recently, genetic algorithm has been recognized as an efficient procedure for solving hard combinatorial optimization problems, but has a defect that requires long-run time and computational complexties to find the solution. For this reason, we adapt a new method called the Critical Node Method that is intuitive, easy to understand, simple for implementation. Fuzzy set theory is frequently used to represent uncertainty of information. In this paper, to treat the data of real world problems we use a fuzzy number to represent the duration and Critical Node Method based heuristic procedure is developed for solving fuzzy assembly line balancing problem.
Keywords