한정된 제조자원능력을 고려한 MRP-C 시스템 적용

Implementation of Finite Capacity-Driven MRP-C System

  • 발행 : 1999.08.01

초록

Modern production control systems based on MRPⅡ (Manufacturing Resource planning) didn't solved about the capacity and lead time problems. In the past, It solved that problems under deterministic. Therefore, the problem about determination of correct lead time and finite capacity are studied continuously by researchers. Now, we need to a integrated method that is from low level to high level instead of top-down in MRP. In this research uses the MRP-C(Capacitated Material Requirement Planning) concept that is more efficient then MRP system for capacity and flexible lead time , and shows the MRP-C algorithm and the prototype.

키워드