Abstract
The state of the art of the 2-stage swirl calciner is to make 2-stage counter gas flow in a calciner with cooler hot air. Gas flow in the calciner increases retention time of raw mix particles. Simple structure of the 2-stage swirl calciner operated optimally the rotary cement kiln. In this study, in order to decide the entrance type of the cooler air of the optimal calciner model, an entrance cooler air velocity, the input points of raw mix were analyzed in many aspects with cold model experiment and computational fluidized dynamic simulation. It was found that the entrance type of cooler air fully splite 2-stage for the optimal condition of the cold model calciner. The operation conditions were that the input feeding, the cooler air velocity and the air velocity of throat were 0.33kg/$\textrm m$3$, 15m/s and 20m/s respectively. The performance of 150 t/d the pilot plant connected with the kiln rising duct was that volume capacity of the calciner is over 430 kg/$\textrm m$3$-h, decarbonation rate of raw mix apparently 90%, heat consumption 950 kcal/kg-cli and retention time of raw mix 2.4 sec. Its the best operating condition is cooler air velocity 18m/s, the gas velocity of throat 25m/s, feeding rate of raw mix 10t/h. The operating experience of the pilot plant confirmed the success of scale up for over 3000 t-cli/d.