This research was aimed to figure out the trend of dust diffusion at open pit limestone mine for assessing the environmental impacts on the high voltage power transmission line. It is rather easy to assess the dust generation and size distribution of limestone dust at the blasting site, but it is very hard to assess the expected area of dust diffusion and amount of dust fall by the distances from the dust source. In this research, a 3-dimensional fluid dynamic simulation software (3D-Flow) was used for analysing the above mentioned matters to assess the impacts to the insulators on the transmission tower by the blasting dust. It was verfied that the 3D-Flow is reliable tool for simulating dust movement, and the limestone dust is not much hazardous to the power transmission line.
본 연구는 석회석 노천채광장의 발파 분진이 주변을 통과하는 특고압 선로에 어느정도 비산 퇴적할 것인지, 어떤 문제를 일으킬 것인지를 평가하기 위한 연구였다. 발파 현장이 분진 발생량 및 입도분포는 그간의 연구 실적도 있고 계측도 가능하지만 얼마만큼의 분진이 어느 정도 거리까지 비산 퇴적할 것인지를 예측하기란 매우 어려운 일이다. 따라서 본 연구에서는 최근 개발한 바 있는 수치유체역학(CFD)을 이용한 3차원 유체거동 해석 프로그램(3D-Flow)을 이용하여 송전선로에 미치는 영향을 예측하는 시도를 하였다. 지형조건, 기상조건에 따른 시뮬레이션을 통하여 석회석 분진은 송전선로에 큰 영향을 미치지 않을 것으로 판단 되었다.