뱃치생산을 하는 용접작업장에서 JIT 납품을 위한 동적생산일정계획

Dynamic Production Scheduling for JIT Delivery in a Welding Shop Adopting Batch-Production

  • 문덕희 (창원대학교 공과대학 산업공학과)
  • 투고 : 19970100
  • 발행 : 1997.07.31

초록

This paper is a report of a simulation study that investigates a dynamic approach to scheduling jobs in a conventional shop floor, especially in an assemoly-type welding process. We consider both JIT arrival and JIT delivery. Various dispatching rules are tested for the following performance measures; mean flow time, rate of tardy jobs, mean tardiness, sum of mean tardiness and mean earliness. The results indicate that SPT rule is the best for the mean flow time. MSLACK that we suggest in this paper, is the best for the mean tardiness and the sum of mean tardiness and mean earliness. However, it is not clear that which rule is the best for the rate of tardy jobs.

키워드