IE interfaces (산업공학)
- Volume 10 Issue 3
- /
- Pages.167-177
- /
- 1997
- /
- 1225-0996(pISSN)
- /
- 2234-6465(eISSN)
Application of The Value Analysis To Redesign Facility Layout
- Laurent, Eyheraguibel (Mechanical Engineering in The Polytechnique de Sevenans) ;
- Jeong, Byung-Ho (Industrial Engineering in The Chonbuk National University) ;
- Lee, Chan-Gie (Industrial Engineering in The Chonbuk National University) ;
- Lee, Sang-Young (Industrial Engineering in The Chonbuk National University)
- Received : 19970300
- Published : 1997.11.30
Abstract
This paper deals with an application of process value analysis method for a manufacturing process in order to redesign facility layout in a paper company. We have used the value analysis method which permits an overall and rigorous study of process by a functional approach. Firstly, customer's expectations for the future process are clearly and precisely expressed with specifications of the Functional Extern Analysis. The existing process is analyzed using various tool of the Functional Internal Analysis in the second part. From the results of these analysis, we find out that the main problems of current facility are due to scheduling and facility layout. This paper is devoted to resolve the second problem. We suggest an ideal solution in order to have a reference solution. Nextly, We give realistic choices and the final solution for the facility layout.
Keywords
- Process Value Analysis;
- Process Specifications;
- Functional Intern and Extern Analysis;
- Facility Layout