산업경영시스템학회지 (Journal of Korean Society of Industrial and Systems Engineering)
- 제20권43호
- /
- Pages.1-16
- /
- 1997
- /
- 2005-0461(pISSN)
- /
- 2287-7975(eISSN)
JIT생산시스템에서 부품공급업자를 고려한 혼합조립순서결정에 관한 연구
Sequencing for Mixed-model Assembly Lines Considering Part Supplier in Just-in-time Production Systems
초록
This paper improves the autonomy for supplier's schedule and the flexibility of the final assembly line. The final assembly line is a single work station and each product taking different assembly time is considered. In the assembly schedule, the heuristic method based on the goal chasing method is used. Consequently, suppliers can independently determine their output rates and thus, change their workload pattern according to their needs and priorities. Moreover, this flexibility can help to avoid expensive final-assembly-line stoppages in case of sudden part supply disruptions. The sequencing method can be easily implemented into an existing just-in-time system. In addition, the mathematical model was formulated and the algorithm was explained through the flow chart. The numerical example was given and the efficiency of this method is shown through the analysis of computational results of that example.
키워드