Abstract
The scheduling problem of satisfying both 0/1 constraint and the timing constraint while minimizing the total error is NP-complete when the optional parts have arbitrary processing times. In this paper, we present a heuristic scheduling algorithm for 0/1 constraint imprecise systems which consist of communicating tasks running on multiple processors. The algorithm is based on the program graph which is similar to the one presented in[4]. To check the schedulability, we apply Lawler and Moore's theorem. To analyze the performance of the proposed algorithm, intensive simulation is done. The results of the simulation shows that the longest processing first selection strategy outperforms random or minimal laxity policies.