대구 지하철 구간내 선형 변동에 따른 소음 및 진동 저감 방안 연구

The optimal control methods to reduce the environmental hazards surrounding the YoungNam Uni. Rotary of City Taegu constructing Subway Line No.1

  • 발행 : 1997.06.01

초록

The objective of this study is to predict the minimization effect of the noise and vibration during the construction and the train operation regarding to the design modification of the Taegu Subway Line No. 1. It was suggested optimal control blasting methods to reduce the causing vibration Nuance to the resident in City Taegu and also proposed the better governing method to decrease the environmental hazard to the near buildings and residents during the train operation. When the high-density gaseous reaction of explosion products exerts a high pressure in motion outward, a dynamic stress field will be created in the surrounding buildings. Therefore, in the region close to the charge, permanent damage begins to occur at a great critical level of partial velocity, that is difficult from different structure as working conditions. It is reliable to predict that the damages could be reduced if we know the peak velocity and the exact reasons through the conducting of detail studies of structural analysis of the related buildings with the optimal blasting designs. A blasting technique should be deemed to take advantage of the reduction of damage of the surrounding rocks and structures to improve the in-city blasting. This is a typical in-city blasting operation where success depends on closely controlling the ground vibrations in case of better designed blasting methods. There are techniques that can be applied to prevent large vibrations from damaging the important buildings through the Route Modification of the Taegu Subway Line No. 1.

키워드

참고문헌

  1. Rock Blasting & Explosive Engineering Pen-Anders Persson;Roger Holmbery;Jaimin Lee
  2. 대구 지하철 지반 분류 기준 대구광역시 지하철 건설 본부
  3. 대구 지하철 2호선 지반 조사 보고서 대구광역시 지하철 건설 본부
  4. 서울 지하철 6-5공구 실시 설계 보고서 서울시 지하철 건설 본부
  5. 터널과 지하공간 v.4 no.3 대구 지하철 터널의 적정지보 패턴 선정에 관한 연구 지왕률;최재진
  6. 창원 터널 축조 확대 공사 보고서 선경건설
  7. 암발파 설계 기법에 관한 연구 한국 토지 개발 공사
  8. 터널 공사 표준 시방서 건설부
  9. 발파 진동의 주변에의 영향과 대책 원기술 편집부(역)
  10. 신발파핸드북 원기술 편집부(역);김정진(감수)
  11. Blast Vibration Monitoring and Control Charles H. Dowding
  12. 건설 기술자를 위한 지반 진동 영향과 대책 천병식;오재응