농업수리구조물의 적정설계홍수량 유도를 위한 유출수문곡선 모형의 개발(II)

Development of Runoff Hydrograph Model for the Derivation of Optimal Design Flood of Agricultural Hydraulic Structures(II)

  • 발행 : 1996.09.01

초록

This study was conducted to develop an optimal runoff bydrograph model by comparison of the peak discharge and time to peak between observed and simulated flows derived by four different models, that is, linear time-invariant, linear time-variant, nonlinear time-invariant and nonlinear time-variant models under the conditions of heavy rainfalls with regionally uniform rainfall intensity in short durations at nine small watersheds. The results obtained through this study can be summarized as follows. 1. Parameters for four models including linear time-invariant, linear time-variant, nonlinear time-invariant and nonlinear time-variant models were calibrated using a trial and error method with rainfall and runoff data for the applied watersheds. Regression analysis among parameters, rainfall and watershed characteristics were established for both linear time-invariant and nonlinear time-invariant models. 2. Correlation coefficients of the simulated peak discharge of calibrated runoff hydrographs by using four models were shown to be a high significant to the peak of observed runoff graphs. Especially, it can be concluded that the simulated peak discharge of a linear time-variant model is approaching more closely to the observed runoff hydrograph in comparison with those of three models in the applied watersheds. 3. Correlation coefficients of the simulated time to peak of calibrated runoff hydrographs by using a linear time-variant model were shown to be a high significant to the time to peak of observed runoff hydrographs than those of the other models. 4. The peak discharge and time to peak of simulated runoff hydrogaphs by using linear time-variant model are verified to be approached more closely to those of observed runoff hydrographs than those of three models in the applied watersheds. 5. It can be generally concluded that the shape of simulated hydrograph based on a linear time-variant model is getting closer to the observed runoff hydrograph than those of three models in the applied watersheds. 6. Simulated hydrographs using the nonlinear time-variant model which is based on more closely to the theoritical background of the natural runoff process are not closer to the observed runoff hydrographs in comparison with those of three models in the applied watersheds. Consequently, it is to be desired that futher study for the nonlinear time-variant model should be continued with verification using rainfall-runoff data of the other watersheds in addition to the review of analyical techniques.

키워드

참고문헌

  1. U.S.Dept. of Agri.,Tech. Bull no.1468 Linear Theory of Hydrologic System Agricultural Research Service
  2. Symposium of Hydrology and Water Resoures Development Instantaneous Unit Hydrograph Derivation by Spectral Analysis and its numerical application Bayazit,M.
  3. Engineering Hydrology Butler,S.S.
  4. Handbook of Applied Hydrology Chow,V.T.
  5. W.R.R. v.5 no.2 Linear time varying Model of Rainfall-Run-off Relation Chieu,Chao-lin;R.P.Bittler
  6. W.R.R. v.6 no.2 Nonlinear time varying Model of Rain-fall-Runoff Relation Chieu,Chao-lin;J.T.Huang
  7. Dissertation for the Ph.D.Univ. of Illinois A basic study of the linearity of the Rainfall-Runoff process in Watersheds Diskin,M.H.
  8. Jour. of Geophysical Research v.64 no.2 A General theory of the Unit Hydrograph Dooge,J.C.
  9. Experiment Station of Iowa State Univ., Res. Bull v.506 Dervation of Hydrographs for small Watersheds from measurable physical characteristics, Agricultrual and Home economics Gray,D.M.
  10. 한국의 홍수 건설부
  11. 한국의 홍수 건설부
  12. 한국의 하천조사서 건설부;산업기지개발공사
  13. 홍수수문자료집, 수자원관리기법 개발연구조사보고서 별책부록 건설부
  14. 하천유량자료의 계산, 수자원관리기법개발연구조사보고서 별책부록 건설부
  15. 국제수문개발계획(IHP) 연구보고서 건설부
  16. Hydrology for Engineers Linsley,R.K.(Others)
  17. 서울대 농학박사학위 논문 한국 주요수계의 소유역에 대한 순간단위도 유도에 관한 연구 이순혁
  18. 한국농공학회지 v.37 no.3·4 농업수리구조물의 적정설계홍수량 유도를 위한 유출수문곡선모형의 개발(Ⅰ) 이순혁;박명근;맹승진
  19. Hyd. Res. Station The Form of the Instantaneous Unit Hydrograph Nash,J.E.
  20. Ins. of C.E. no.6282 Determining Runoff form Rainfall Nash,J.E.
  21. IAHR, 9th Convention A Linear Transformation of a Discharge Record Nash,J.E.
  22. Jour. of Hyd. Div.ASCE v.93 no.Hyd.4 A Nonlinear Hydrologic System Response Model Prasad,R.
  23. Trans. of Ame.Geophys. Union v.19 Synthetic Unit Graphs Snyder,F.F.
  24. Hydrology Section 4 Soil Conservation Service
  25. U.S.Dept. fo Agriculture U.S.Dept. fo Agriculture
  26. Trans. of Ame. Soc. of Agri. Eng. v.15 no.3 Characteristics of Short Duration Unit Hydrograph Wang,Ru Yih;I.P.Wu
  27. W.R.R.C,U.O.H.,Tech. Report. no.15 Hydrologica Data and Peak Discharge Determenation of Small Hawaiian Watersheds Wu,I.P.
  28. Research Data Assembly for Small Watersheds Floods Yevjevich,V.M.