References
- IEEE/ANS P-7.4.3.2 Standard Criteria for Digital Computers in Safety Systems of Nuclear Power Genrating Stations
- Digital Systems Reliability and Nuclear Safety Workshop U.S.Nuclear Regulatory Conission
- SECY-93-087 Policy, Technical, and Licensing Issues Pertaining to Evolutionary and Advanced Light-Water Peactor(ALWR) Designs
- Nuclear Safety v.34 no.1 The Nuplex 80 + Advanced Control Complex from ABB Combustion Engineering F.Ridolfo(et al.)
- Nuclear Power Plant Journal Digital Safety System Operating Experience at ABB CE Plant Edgar M. Brown
- Nuclear Engineering International Why Utilities Go Digital for I&C Replacement James T. Keiper
- Nuclear Engineering International Putting in a Replacement for Controlbloc P20 at Chooze B B.Appell
- Nuclear Engineering International Digital Systems Review of Safety Critical Applications Geoffrey Ives
- Nuclear Engineering International Protection Reliability:Nuclear Electric Presents Its Case Sizewell B Reactor